Difference between revisions of "RC Helpsheet"
From Hall D Ops Wiki
Line 18: | Line 18: | ||
* [https://cebaf.jlab.org/pd/run-coordinator-reports Summary for MCC 13:30 Wed] | * [https://cebaf.jlab.org/pd/run-coordinator-reports Summary for MCC 13:30 Wed] | ||
* [https://accweb.acc.jlab.org/btm/reports/beam-time-summary Accelerator beam time summary for the week (pie chart)] | * [https://accweb.acc.jlab.org/btm/reports/beam-time-summary Accelerator beam time summary for the week (pie chart)] | ||
− | * [https://halldweb.jlab.org/hdops/wiki/index.php/Hall_D_Runs RC summary] to be sent to Eugene, cc Alexandre Deur (most ppl send them to the collaboration too) | + | * [https://halldweb.jlab.org/hdops/wiki/index.php/Hall_D_Runs RC summary] to be sent in an email to Eugene, cc Alexandre Deur (most ppl send them to the collaboration too) Alexandre adds them to the wiki page. |
* [https://epicsweb.jlab.org/wave/?myaDeployment=ops&myaLimit=100000&title=&fullscreen=false&layoutMode=1&viewerMode=2&pv=IBCAD00CRCUR6&pv=HD%3Acoda%3Adaq%3Astatus&RESET%3Ai%3AGasPanelBarPress1yAxisLabel=&RESET%3Ai%3AGasPanelBarPress1yAxisMin=&RESET%3Ai%3AGasPanelBarPress1yAxisMax=&RESET%3Ai%3AGasPanelBarPress1scaler=&RESET%3Ai%3AGasPanelBarPress1yAxisLog=&windowMinutes=1440&start=2022-10-26+16%3A23%3A49&end=2022-10-26+16%3A28%3A49&IBCAD00CRCUR6label=IBCAD00CRCUR6&IBCAD00CRCUR6color=%23a6cee3&IBCAD00CRCUR6yAxisLabel=&IBCAD00CRCUR6yAxisMin=&IBCAD00CRCUR6yAxisMax=&IBCAD00CRCUR6yAxisLog=&IBCAD00CRCUR6scaler=&HD%3Acoda%3Adaq%3Astatuslabel=HD%3Acoda%3Adaq%3Astatus&HD%3Acoda%3Adaq%3Astatuscolor=%231f78b4&HD%3Acoda%3Adaq%3AstatusyAxisLabel=&HD%3Acoda%3Adaq%3AstatusyAxisMin=&HD%3Acoda%3Adaq%3AstatusyAxisMax=&HD%3Acoda%3Adaq%3AstatusyAxisLog=&HD%3Acoda%3Adaq%3Astatusscaler= WAVE gui] plot showing DAQ status and beam current for the last 24h | * [https://epicsweb.jlab.org/wave/?myaDeployment=ops&myaLimit=100000&title=&fullscreen=false&layoutMode=1&viewerMode=2&pv=IBCAD00CRCUR6&pv=HD%3Acoda%3Adaq%3Astatus&RESET%3Ai%3AGasPanelBarPress1yAxisLabel=&RESET%3Ai%3AGasPanelBarPress1yAxisMin=&RESET%3Ai%3AGasPanelBarPress1yAxisMax=&RESET%3Ai%3AGasPanelBarPress1scaler=&RESET%3Ai%3AGasPanelBarPress1yAxisLog=&windowMinutes=1440&start=2022-10-26+16%3A23%3A49&end=2022-10-26+16%3A28%3A49&IBCAD00CRCUR6label=IBCAD00CRCUR6&IBCAD00CRCUR6color=%23a6cee3&IBCAD00CRCUR6yAxisLabel=&IBCAD00CRCUR6yAxisMin=&IBCAD00CRCUR6yAxisMax=&IBCAD00CRCUR6yAxisLog=&IBCAD00CRCUR6scaler=&HD%3Acoda%3Adaq%3Astatuslabel=HD%3Acoda%3Adaq%3Astatus&HD%3Acoda%3Adaq%3Astatuscolor=%231f78b4&HD%3Acoda%3Adaq%3AstatusyAxisLabel=&HD%3Acoda%3Adaq%3AstatusyAxisMin=&HD%3Acoda%3Adaq%3AstatusyAxisMax=&HD%3Acoda%3Adaq%3AstatusyAxisLog=&HD%3Acoda%3Adaq%3Astatusscaler= WAVE gui] plot showing DAQ status and beam current for the last 24h | ||
Revision as of 15:25, 21 November 2022
Meetings
- 07:45 M-F PD/RC zoom
- 08:00 M-F & 13:30 Wed MCC zoom
- 08:45 M-F Hall D zoom Hall D wiki page
- Logbook post with full connection details for MCC meetings
Shifts
- Hall D shift email list JLab email search page
- If someone does not show up, contact the PDL. Required training Training status
- Approval from Eugene is needed to change shift status (cancel/standby)
- Someone must be present if the cryogenic target is full.
- If the magnet is on, then someone should be in the counting house. If shifts are cancelled then the magnet can stay on if the hall in power permit or beam permit and the crew are instructed not to permit accesses without RC approval. Check with Eugene.
End of the week reports
- Keep track of BANU time, will need to present it. Alexandre keeps track of the total % of time used and data collected.
- Summary for MCC 13:30 Wed
- Accelerator beam time summary for the week (pie chart)
- RC summary to be sent in an email to Eugene, cc Alexandre Deur (most ppl send them to the collaboration too) Alexandre adds them to the wiki page.
- WAVE gui plot showing DAQ status and beam current for the last 24h
MCC busy times
- Accelerator shift changes are nominally 7:30-8:30 am, 3:30-4:30pm, and 11:30pm-12:30am.
- Please strictly avoid 8:00-8:15am, 4:00-4:15pm, and 12:00-12:15am when making non-emergency requests for beam delivery modifications. (from page 8 of this)
The phone
- It can be forwarded to your cellphone.