Difference between revisions of "Short Term Run Plan"

From Hall D Ops Wiki
Jump to: navigation, search
(Special instructions)
(Run conditions)
Line 12: Line 12:
 
* Collimator: 5.0 mm
 
* Collimator: 5.0 mm
 
* TPOL converter: Be 75 um
 
* TPOL converter: Be 75 um
* Runs are no more than 2 hours (~400M triggers)- see whiteboard for the production cycle
+
* Runs are no more than 2 hours - see whiteboard for the production cycle
 
* Target: Liquid Hydrogen
 
* Target: Liquid Hydrogen
  
 
* DAQ configuration - see whiteboard
 
* DAQ configuration - see whiteboard
 
  
 
== Current Experiment ==
 
== Current Experiment ==

Revision as of 11:27, 16 April 2025

Last updated 3 April 2025

Special instructions

  • pi0 running
    • 300 nA beam current, 4.5 E-4 Al (amo, on the goniometer)
    • TAGH_HV_ProductionSpring2023_300nA.snap

Run conditions

  • Radiator: 4.5 E-4 Al (amo, on the goniometer)
  • Collimator: 5.0 mm
  • TPOL converter: Be 75 um
  • Runs are no more than 2 hours - see whiteboard for the production cycle
  • Target: Liquid Hydrogen
  • DAQ configuration - see whiteboard

Current Experiment

GlueX II (with DIRC) & JEF and Alpha

  • In the BTM this is "GlueX 2 / JEF"