Difference between revisions of "Short Term Run Plan"

From Hall D Ops Wiki
Jump to: navigation, search
(Run conditions)
 
(43 intermediate revisions by 3 users not shown)
Line 1: Line 1:
Do reload this page, it gets updated frequently.
+
Last updated - see smallprint at the bottom of the page
  
== Current Experiment ==
+
== Run Plan ==
Rare Eta Decay & GlueX II (with DIRC)
+
* Experiment number: E12-12-002 (use in BTA shift information)
+
* [https://misportal.jlab.org/mis/physics/experiments/viewProposal.cfm?paperId=834 Proposal]
+
* Spokesperson: C. A. Meyer
+
  
== Notes ==
+
Production running cycling through targets:
* All GlueX detectors (including DIRC)
+
* '''JD80-212 80um''' diamond, '''200 nA''' beam current
 +
** 800M events for '''0/90 deg''' and '''PARA''' setting
 +
** 800M events for '''0/90 deg''' and '''PERP''' setting
 +
** 800M events for '''45/135 deg''' and '''PARA''' setting
 +
** 800M events for '''45/135 deg''' and '''PERP''' setting
 +
* 400M events with '''4.5×10-4 Al 40um''' radiator (on goniometer!), '''300 nA''' beam current
 +
** Set '''new reference for amorphous radiator''' in CBREM GUI.
 +
* Runs should be no longer than 2 hours.
 +
* Keep the state of the production cycle on the whiteboard up-to-date.
 +
 
 +
== Special instructions ==  
 +
 
 +
* Put '''comments''' for each run in the window opened by the DAQ.
 +
** The comment should at least contain the following information "<radiator> <PARA/PERP>, <beam current>, LH2 target, <typical trigger rate>, <typical live time>, <issues if any>"
 +
** Example: "JD80-212 80um 45/135 PARA, 200nA, LH2 target, 81kHz, 93% live time"
 +
** Note: due to a software issue run comments may not show up in RCDB, but they are saved by the DAQ and will be later added to the RCDB entries.
 +
* Set a new '''amorphous reference''' in the CBREM GUI each time the amorphous radiator is used.
 +
* Be sure to hit the '''"PARA" or "PERP" button''' in the CBREM GUI when switching diamond targets. Otherwise the diamond alignment may be in an undefined state and the experiment may be flooded with low-energy photons.
 +
* Watch for '''locked-up FCAL HV bases''' towards the end of a run and clear them before starting a new run. See [https://halldweb.jlab.org/hdops/wiki/index.php/Forward_Calorimeter_Shift#FCAL_High_Voltage_channel_with_yellow_border].
 +
* Watch the '''DAQ lifetime''' when beam is on. Sometimes it drops to 0%. Just stopping and restarting the run fixes this issue in most cases.
 +
* [https://forms.gle/N1cU1GWgXr81pWDc6 '''New hdops wiki feedback form is here'''] please use this to report confusing or outdated wiki instruction pages.
 +
 
 +
== Medium Term (1 week) ==
 +
 
 +
* No special plans.
  
 
== Run conditions ==
 
== Run conditions ==
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room whiteboard]
 
  
<s>* Radiator: JD70-103 50 um diamond (4 orientations: 0, 90, 45, -45)
+
* Radiators: see [https://halldweb.jlab.org/hdops/wiki/index.php/Short_Term_Run_Plan#Run_Plan Run Plan]
 
* Collimator: 5.0 mm
 
* Collimator: 5.0 mm
 
* TPOL converter: Be 75 um
 
* TPOL converter: Be 75 um
* Runs are no more than 2 hours (~400M triggers)- see whiteboard for the production cycle
 
 
* Target: Liquid Hydrogen
 
* Target: Liquid Hydrogen
 +
* DAQ configuration
 +
** RUN = PHYSICS_DIRC
 +
** SETUP = hd_all.tsg_HLN
 +
** Production: TRIGGER = FCAL_BCAL_PS_2025_mod_m9.conf
 +
** Raw-mode runs: TRIGGER = FCAL_BCAL_PS_2025_mod_m10.conf
  
DAQ configuration
+
== Current Experiment ==
* Setup: FCAL_BCAL_PS_m9
+
GlueX II (with DIRC) & JEF and Alpha
* Production: PHYSICS_DIRC
+
* In the BTM this is "GlueX 2 / JEF"
* (Raw mode: PHYSICS_DIRC_RAW)</s>
+
* E12-12-002 [https://misportal.jlab.org/mis/physics/experiments/viewProposal.cfm?paperId=834 GlueX II Proposal]
 
+
* E12-10-011 [https://www.jlab.org/exp_prog/proposals/proposal_updates/PR12-10-011_pac37.pdf JEF proposal]
== Run plan ==
+
* E12-12-002a [https://arxiv.org/abs/2405.01288 Alpha Proposal]
See the daily plan in [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Spring2023 Run Coordination Meetings:Spring2023] and also the [https://halldweb.jlab.org/online/whiteboard/ counting house whiteboard]
+
 
+
== Shift duties  ==
+
 
+
[[Shift_Guidelines_for_Shift_Leader|Shift Leader]]
+
 
+
[[Guidelines_for_Remote_Worker_Shift|Shift Worker]]
+

Latest revision as of 12:11, 14 May 2025

Last updated - see smallprint at the bottom of the page

Run Plan

Production running cycling through targets:

  • JD80-212 80um diamond, 200 nA beam current
    • 800M events for 0/90 deg and PARA setting
    • 800M events for 0/90 deg and PERP setting
    • 800M events for 45/135 deg and PARA setting
    • 800M events for 45/135 deg and PERP setting
  • 400M events with 4.5×10-4 Al 40um radiator (on goniometer!), 300 nA beam current
    • Set new reference for amorphous radiator in CBREM GUI.
  • Runs should be no longer than 2 hours.
  • Keep the state of the production cycle on the whiteboard up-to-date.

Special instructions

  • Put comments for each run in the window opened by the DAQ.
    • The comment should at least contain the following information "<radiator> <PARA/PERP>, <beam current>, LH2 target, <typical trigger rate>, <typical live time>, <issues if any>"
    • Example: "JD80-212 80um 45/135 PARA, 200nA, LH2 target, 81kHz, 93% live time"
    • Note: due to a software issue run comments may not show up in RCDB, but they are saved by the DAQ and will be later added to the RCDB entries.
  • Set a new amorphous reference in the CBREM GUI each time the amorphous radiator is used.
  • Be sure to hit the "PARA" or "PERP" button in the CBREM GUI when switching diamond targets. Otherwise the diamond alignment may be in an undefined state and the experiment may be flooded with low-energy photons.
  • Watch for locked-up FCAL HV bases towards the end of a run and clear them before starting a new run. See [1].
  • Watch the DAQ lifetime when beam is on. Sometimes it drops to 0%. Just stopping and restarting the run fixes this issue in most cases.
  • New hdops wiki feedback form is here please use this to report confusing or outdated wiki instruction pages.

Medium Term (1 week)

  • No special plans.

Run conditions

  • Radiators: see Run Plan
  • Collimator: 5.0 mm
  • TPOL converter: Be 75 um
  • Target: Liquid Hydrogen
  • DAQ configuration
    • RUN = PHYSICS_DIRC
    • SETUP = hd_all.tsg_HLN
    • Production: TRIGGER = FCAL_BCAL_PS_2025_mod_m9.conf
    • Raw-mode runs: TRIGGER = FCAL_BCAL_PS_2025_mod_m10.conf

Current Experiment

GlueX II (with DIRC) & JEF and Alpha