Difference between revisions of "Short Term Run Plan"

From Hall D Ops Wiki
Jump to: navigation, search
(Shift duties)
 
(98 intermediate revisions by 6 users not shown)
Line 1: Line 1:
== Last updated ==
+
Last updated - see smallprint at the bottom of the page
17 Oct 2022 by Susan Schadmand: 28 August, by PrimEx-eta group
+
<!--
+
= <span style="color:#FF1493;font-size:150%">[https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_Short_Term_Run_Plan Click here for the Short term plan for PrimEx-eta!] </span>=
+
-->
+
  
== Current Experiment ==
+
== Run Plan ==
Measure the &eta;-meson radiative decay width (&eta; -> &gamma;&gamma;)
+
* Experiment number: E12-10-011 (use in BTA shift information)
+
* Proposal: [https://www.jlab.org/exp_prog/proposals/10/PR12-10-011.pdf PAC link]
+
* Spokesperson: Ashot Gasparian
+
  
== Notes ==
+
Production running cycling through targets:
* All GlueX detectors, except DIRC
+
* '''JD80-212 80um''' diamond, '''200 nA''' beam current
* CCAL in use (4 m downstream FCAL to cover polar between 0.2 and 1 degree and measure Compton events in combination with FCAL)
+
** 800M events for '''0/90 deg''' and '''PARA''' setting
* CDC Weather alarm, aka Alarm on HD:coda:cdc:p_diff, see https://logbooks.jlab.org/entry/4001862
+
** 800M events for '''0/90 deg''' and '''PERP''' setting
** Stop run - Acknowledge alarm and document it - Start new run
+
** 800M events for '''45/135 deg''' and '''PARA''' setting
 +
** 800M events for '''45/135 deg''' and '''PERP''' setting
 +
* 400M events with '''4.5×10-4 Al 40um''' radiator (on goniometer!), '''300 nA''' beam current
 +
** Set '''new reference for amorphous radiator''' in CBREM GUI.
 +
* Runs should be no longer than 2 hours.
 +
* Keep the state of the production cycle on the whiteboard up-to-date.
  
== Run conditions ==
+
== Special instructions ==  
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room whiteboard]
+
  
* Radiator (Amorphous) 10 µm Al (1 x 10-4 RL)
+
* Put '''comments''' for each run in the window opened by the DAQ.
* Collimator 5 mm
+
** The comment should at least contain the following information "<radiator> <PARA/PERP>, <beam current>, LH2 target, <typical trigger rate>, <typical live time>, <issues if any>"
* TPOL converter Be 750 µm
+
** Example: "JD80-212 80um 45/135 PARA, 200nA, LH2 target, 81kHz, 93% live time"
 +
** Note: due to a software issue run comments may not show up in RCDB, but they are saved by the DAQ and will be later added to the RCDB entries.
 +
* Set a new '''amorphous reference''' in the CBREM GUI each time the amorphous radiator is used.
 +
* Be sure to hit the '''"PARA" or "PERP" button''' in the CBREM GUI when switching diamond targets. Otherwise the diamond alignment may be in an undefined state and the experiment may be flooded with low-energy photons.
 +
* Watch for '''locked-up FCAL HV bases''' towards the end of a run and clear them before starting a new run. See [https://halldweb.jlab.org/hdops/wiki/index.php/Forward_Calorimeter_Shift#FCAL_High_Voltage_channel_with_yellow_border].
 +
* Watch the '''DAQ lifetime''' when beam is on. Sometimes it drops to 0%. Just stopping and restarting the run fixes this issue in most cases.
 +
* [https://forms.gle/N1cU1GWgXr81pWDc6 '''New hdops wiki feedback form is here'''] please use this to report confusing or outdated wiki instruction pages.
  
* Runs are no more than 2 hours - see whiteboard for the production cycle
+
== Medium Term (1 week) ==
  
* Targets:
+
* No special plans.
** 4He target: cryogenic target
+
*** FULL if supply pressure at < 23psi
+
*** EMPTY if supply pressure at > 27psi
+
** Be target
+
** Empty Be target
+
  
DAQ config
+
== Run conditions ==
* Setup: PHYSICS_PRIMEX
+
* Production: CCAL_FCAL_PS_m9
+
* (Raw mode: config TBA)
+
  
== Run plan ==
+
* Radiators: see [https://halldweb.jlab.org/hdops/wiki/index.php/Short_Term_Run_Plan#Run_Plan Run Plan]
See the daily plan in [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Fall2022 Run Coordination Meetings:Fall2022] and also the [https://halldweb.jlab.org/online/whiteboard/ counting house whiteboard]
+
* Collimator: 5.0 mm
 +
* TPOL converter: Be 75 um
 +
* Target: Liquid Hydrogen
 +
* DAQ configuration
 +
** RUN = PHYSICS_DIRC
 +
** SETUP = hd_all.tsg_HLN
 +
** Production: TRIGGER = FCAL_BCAL_PS_2025_mod_m9.conf
 +
** Raw-mode runs: TRIGGER = FCAL_BCAL_PS_2025_mod_m10.conf
  
== Shift duties  ==
+
== Current Experiment ==
 
+
GlueX II (with DIRC) & JEF and Alpha
GlueX Guidelines are at [[Shift_Guidelines_for_Shift_Leader]] and [[Guidelines_for_Remote_Worker_Shift]]
+
* In the BTM this is "GlueX 2 / JEF"
 
+
* E12-12-002 [https://misportal.jlab.org/mis/physics/experiments/viewProposal.cfm?paperId=834 GlueX II Proposal]
=== run comments ===
+
* E12-10-011 [https://www.jlab.org/exp_prog/proposals/proposal_updates/PR12-10-011_pac37.pdf JEF proposal]
 
+
* E12-12-002a [https://arxiv.org/abs/2405.01288 Alpha Proposal]
Put information, eg "production 25 nA Pb", in the run comments window of the DAQ. The comments are needed for RCDB.
+
 
+
The run comments window should appear automatically after a run has been started. Enter comments and SAVE, do not exit. If the run comments window is visible, check first whether it is hiding eg on the upper workspcace. If it is not up, restart the DAQ before start of the next run.
+
 
+
=== list of production runs ===
+
 
+
* Include a separate list of the runs taken during the shift at the end of the shift leader summary
+
* Please include the following:  
+
*:run number,    start & stop times,    beam current,    Be or He4 target / no target/empty target,  radiator,  daq configuration,  daq event rate,  daq livetime,  number of events,  production/test/junk/any_other_comment
+
 
+
=== BTA sheet ===
+
 
+
* The '''BTA''' guidelines are at [[BTA_guidelines]]. <br> After loading the EPICS values, you may change the values, eg round them up or down.
+
** '''BANU values''' should be reflected in the PCC (or UED) value (else the aftermath doesnt work out for RC), put a comment for > 5minutes.
+
** '''UED:''' unplanned experiment down (hardware failure).
+
 
+
=== strip charts ===
+
 
+
* Log the '''strip charts''' of beam current and position, see [[Slow_Controls_Shift#MYA_Archiver]]
+
** on a gluon machine type LivePlot
+
** right-click on the screen and select "Load a Configuration"
+
** the configuration "'''beam_psc'''" provides the currently desired information
+
** right-click on the screen and select '''"Make Elog Entry"''', make sure you do not log to ELOG but to '''HDLOG'''.
+
 
+
=== CSS GlueX Overview ===
+
 
+
log per run, [[Slow_Controls_Shift#EPICS_Control_Screens]]
+
 
+
"Alt L" brings up the [[Logbook_Screenshot_Tool | screenshot tool for making E-log entries]]
+
 
+
=== data monitoring plots ===
+
 
+
log per run, [[Online_Monitoring_Shift]]
+
 
+
=== shift checklist ===
+
 
+
Log per shift, [[Shift_Checklist]]
+
 
+
== Special instructions ==
+
 
+
=== Hall Delta ===
+
 
+
It's good practice to refer to our hall as Delta when talking to MCC, to make sure that there is no acoustic confusion between us and Hall B.
+
 
+
=== Screenshot Tool ===
+
 
+
"Alt L" brings up the [[Logbook_Screenshot_Tool | screenshot tool for making E-log entries]]
+
 
+
=== After beam restoration ===
+
 
+
* see [[Beam_Line_Detectors_Shift#Collimator_and_Radiators]] on how to move radiators and collimator
+
 
+
* check the '''radiation levels''' without radiator and then with the radiator
+
** see the whiteboard (bottom RHS corner of the RH board) - there are columns of values expected without and with the radiator
+
* '''retract the radiator'''
+
* '''collimator in blocking position'''
+
* ask MCC to do their harp scan
+
* our '''harp scans''': follow the instructions in [[Beam_Line_Detectors_Shift#Radiator_Harp_Scan]]
+
 
+
=== Target status ===
+
 
+
* check camera west-cam.jlab.org, select Target view, if necessary
+
 
+
=== rootspy  ===
+
 
+
If you have to restart rootspy, [[Online_Monitoring_Shift#Routine_Operation]], and it crashes, you might have to restart the monitoring process, find help at [[Online_Monitoring_Shift#Starting_and_stopping_the_Monitoring_System]].
+
 
+
=== DAQ issues ===
+
 
+
Call the expert. In case they suggest that you restart the DAQ, find information at [[Data_Acquisition_Shift]].
+

Latest revision as of 12:11, 14 May 2025

Last updated - see smallprint at the bottom of the page

Run Plan

Production running cycling through targets:

  • JD80-212 80um diamond, 200 nA beam current
    • 800M events for 0/90 deg and PARA setting
    • 800M events for 0/90 deg and PERP setting
    • 800M events for 45/135 deg and PARA setting
    • 800M events for 45/135 deg and PERP setting
  • 400M events with 4.5×10-4 Al 40um radiator (on goniometer!), 300 nA beam current
    • Set new reference for amorphous radiator in CBREM GUI.
  • Runs should be no longer than 2 hours.
  • Keep the state of the production cycle on the whiteboard up-to-date.

Special instructions

  • Put comments for each run in the window opened by the DAQ.
    • The comment should at least contain the following information "<radiator> <PARA/PERP>, <beam current>, LH2 target, <typical trigger rate>, <typical live time>, <issues if any>"
    • Example: "JD80-212 80um 45/135 PARA, 200nA, LH2 target, 81kHz, 93% live time"
    • Note: due to a software issue run comments may not show up in RCDB, but they are saved by the DAQ and will be later added to the RCDB entries.
  • Set a new amorphous reference in the CBREM GUI each time the amorphous radiator is used.
  • Be sure to hit the "PARA" or "PERP" button in the CBREM GUI when switching diamond targets. Otherwise the diamond alignment may be in an undefined state and the experiment may be flooded with low-energy photons.
  • Watch for locked-up FCAL HV bases towards the end of a run and clear them before starting a new run. See [1].
  • Watch the DAQ lifetime when beam is on. Sometimes it drops to 0%. Just stopping and restarting the run fixes this issue in most cases.
  • New hdops wiki feedback form is here please use this to report confusing or outdated wiki instruction pages.

Medium Term (1 week)

  • No special plans.

Run conditions

  • Radiators: see Run Plan
  • Collimator: 5.0 mm
  • TPOL converter: Be 75 um
  • Target: Liquid Hydrogen
  • DAQ configuration
    • RUN = PHYSICS_DIRC
    • SETUP = hd_all.tsg_HLN
    • Production: TRIGGER = FCAL_BCAL_PS_2025_mod_m9.conf
    • Raw-mode runs: TRIGGER = FCAL_BCAL_PS_2025_mod_m10.conf

Current Experiment

GlueX II (with DIRC) & JEF and Alpha