Difference between revisions of "Collect More Regular Data"
From Hall D Ops Wiki
(→Main Page) |
|||
Line 1: | Line 1: | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==Collect More Regular Data== | ==Collect More Regular Data== | ||
# Goal: Collect data for calibration and characterization of the detector. | # Goal: Collect data for calibration and characterization of the detector. | ||
Line 22: | Line 13: | ||
#* If time permits, and all other tasks are done | #* If time permits, and all other tasks are done | ||
#* Take enough data for preliminary calibration and alignment of the detector. At least one week of running. | #* Take enough data for preliminary calibration and alignment of the detector. At least one week of running. | ||
+ | |||
+ | [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Back to main Fall14 commissioning page] |
Revision as of 10:12, 21 August 2014
Collect More Regular Data
- Goal: Collect data for calibration and characterization of the detector.
- Responsibility: HallD
- Conditions:
- Tagger hall equipment in place and operating.
- Beam 50nA CW
- Radiator is 10-4.
- Collimator hole is 3.5mm.
- Solenoid 1200A.
- GlueX detectors are on.
- Thin commissioning target at various positions.
- Activities
- If time permits, and all other tasks are done
- Take enough data for preliminary calibration and alignment of the detector. At least one week of running.