Difference between revisions of "Approved Procedures"
From Hall D Ops Wiki
(→DRAFT Procedures) |
|||
Line 5: | Line 5: | ||
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=19709 Hall D Solenoid Magnet - Cryogenic Operations (ENG-12-19709-OSP)] | * [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=19709 Hall D Solenoid Magnet - Cryogenic Operations (ENG-12-19709-OSP)] | ||
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=22021 Hall D Solenoid Magnet - Powered Operations (FEL-13-22021-OSP)] | * [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=22021 Hall D Solenoid Magnet - Powered Operations (FEL-13-22021-OSP)] | ||
+ | * [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=22021 Hall D Solenoid Power Supply Test and Maintenance (-13-21781-OSP)] | ||
* [https://misportal.jlab.org/jlabDocs/document.seam?id=78791 Training for Work in the FCAL Dark Room (D00000-01-06-P006)] | * [https://misportal.jlab.org/jlabDocs/document.seam?id=78791 Training for Work in the FCAL Dark Room (D00000-01-06-P006)] | ||
Revision as of 18:02, 25 June 2014
There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:
- Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)
- Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)
- Hall D Solenoid Magnet - Cryogenic Operations (ENG-12-19709-OSP)
- Hall D Solenoid Magnet - Powered Operations (FEL-13-22021-OSP)
- Hall D Solenoid Power Supply Test and Maintenance (-13-21781-OSP)
- Training for Work in the FCAL Dark Room (D00000-01-06-P006)
DRAFT Procedures
There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure:
- Hall D Detector Gas System Purge Procedure (Dave Butler)
- Installation/Removal of FDC (Bill Crahen).
- Hall D CDC Installation Procedure (Tim Whitlatch)
- Hall D Vacuum-Thin Window Procedures (Tom Carstens)
- Solenoid Vacuum System Check Procedures (George Biallas)
- Hall D Solenoid Hi-Pot Procedure (Giles Brown)
- Cryogenic target. Will not be used during 2014 commissioning (Chris Keith)