Best Practices
- Run Control
- Every run should be begun starting at the "Configure" step in the Run Control GUI.
- Every run should have at least a brief descriptive comment entered, even those taken by experts performing tests.
- Here is an example of a good comment for a production run: Radiator is JD70-119, PARA, Target Full, Mode 7, 200nA, 182 M events, good beam, occasional FSD trip, FCAL HV alarms, livetime ~90%, event rate ~ 30kHz, data rate ~600 MB/sec
- Logbook Entries
- Each shift should have a summary entry where events and runs are logged, including all interactions with the MCC. Major events should also have their own log entries. A good example of a summary entry is at this link.
- Data Quality Monitoring
- The summary logbook entry should have a summary of at minimum the production run taken during the shift along with the number of triggers in each run and the radiator information.
- Once per day a harp scan should be run following the directions at this link. Note that the beam is expected to be Gaussian with sigmas in the range 0.6mm to ~1.2mm, but any action should be taken by the RC.
FAQ
What should I do if I can't find an answer
If you have a question that is not answered by this wiki, first look to the whiteboard in the counting house. If that does not answer your question, ask the RC.