Collect More Regular Data
From Hall D Ops Wiki
Collect More Regular Data
- Goal: Collect data for calibration and characterization of the detector.
- Responsibility: HallD
- Expected Schedule:
- Oct 20 - Oct 31 : 12 days
- Conditions:
- Tagger hall equipment in place and operating.
- Beam 50nA CW
- Radiator is 10-4.
- Collimator hole is 5 mm.
- Solenoid 1200A.
- GlueX detectors are on.
- Thin commissioning targets at various positions.
- Activities
- If time permits, and all other tasks are done
- Take enough data for preliminary calibration and alignment of the detector. At least one week of running.