Difference between revisions of "Approved Procedures"

From Hall D Ops Wiki
Jump to: navigation, search
(DRAFT Procedures)
(DRAFT Procedures)
Line 17: Line 17:
 
* [[Media:Hall D Solenoid Vacuum check list.pdf | Solenoid Vacuum System Check Procedures]] (George Biallas)
 
* [[Media:Hall D Solenoid Vacuum check list.pdf | Solenoid Vacuum System Check Procedures]] (George Biallas)
 
* [[Media:Hall D Solenoid Hi-Pot procedure.pdf | Hall D Solenoid Hi-Pot Procedure ]] (Giles Brown)
 
* [[Media:Hall D Solenoid Hi-Pot procedure.pdf | Hall D Solenoid Hi-Pot Procedure ]] (Giles Brown)
* Cryogenic target. (Chris Keith)
+
* Cryogenic target. Will ''not'' be used during 2014 commissioning (Chris Keith)

Revision as of 13:13, 24 June 2014

There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:

DRAFT Procedures

There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure: