Difference between revisions of "Approved Procedures"

From Hall D Ops Wiki
Jump to: navigation, search
Line 8: Line 8:
 
** Full list of procedures for the solenoid can be found under [[Solenoid Expert | Solenoid Expert Documentation]]
 
** Full list of procedures for the solenoid can be found under [[Solenoid Expert | Solenoid Expert Documentation]]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=78791  Training for Work in the FCAL Dark Room (D00000-01-06-P006)]
 
* [https://misportal.jlab.org/jlabDocs/document.seam?id=78791  Training for Work in the FCAL Dark Room (D00000-01-06-P006)]
 +
* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2512 Installation/Removal of FDC] (Bill Crahen).
 +
* [[Media:Hall D Vacuum-Thin window procedures.pdf |Hall D Vacuum-Thin Window Procedures]] (Tom Carstens)
  
 
== DRAFT Procedures ==  
 
== DRAFT Procedures ==  
Line 13: Line 15:
 
There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure:
 
There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure:
  
* [[Media:Hall D Detector Gas system purge procedure.pdf | Hall D Detector Gas System Purge Procedure ]] (Dave Butler)
+
 
* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2512 Installation/Removal of FDC] (Bill Crahen).
+
* [[Media:Hall D CDC Installation procedure.pdf | Hall D CDC Installation Procedure ]] - signature approval underway (Tim Whitlatch)
* [[Media:Hall D CDC Installation procedure.pdf | Hall D CDC Installation Procedure ]] (Tim Whitlatch)
+
* [[Media:Hall D Detector Gas system purge procedure.pdf | Hall D Detector Gas System Purge Procedure ]] - final draft  (Dave Butler)
* [[Media:Hall D Vacuum-Thin window procedures.pdf |Hall D Vacuum-Thin Window Procedures]] (Tom Carstens)
+
* [[Media:Hall D Solenoid Vacuum check list.pdf | Solenoid Vacuum System Check Procedures]] (George Biallas)
+
* [[Media:Hall D Solenoid Hi-Pot procedure.pdf | Hall D Solenoid Hi-Pot Procedure ]] (Giles Brown)
+
 
* Cryogenic target. Will ''not'' be used during 2014 commissioning (Chris Keith)
 
* Cryogenic target. Will ''not'' be used during 2014 commissioning (Chris Keith)

Revision as of 09:18, 25 August 2014

There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:

DRAFT Procedures

There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure: