There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure: | There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure: | ||
− | |||
* [[Media:Hall D CDC Installation procedure.pdf | Hall D CDC Installation Procedure ]] - signature approval underway (Tim Whitlatch) | * [[Media:Hall D CDC Installation procedure.pdf | Hall D CDC Installation Procedure ]] - signature approval underway (Tim Whitlatch) | ||
* [[Media:Hall D Detector Gas system purge procedure.pdf | Hall D Detector Gas System Purge Procedure ]] - final draft (Dave Butler) | * [[Media:Hall D Detector Gas system purge procedure.pdf | Hall D Detector Gas System Purge Procedure ]] - final draft (Dave Butler) | ||
* Cryogenic target. Will ''not'' be used during 2014 commissioning (Chris Keith) | * Cryogenic target. Will ''not'' be used during 2014 commissioning (Chris Keith) |
Revision as of 09:19, 25 August 2014
There are several procedures that are necessary for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they are to be performed only by qualified personnel as specified in the reviewed procedure:
- Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)
- Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)
- Hall D Solenoid Magnet - Cryogenic Operations (ENG-12-19709-OSP)
- Hall D Solenoid Magnet - Powered Operations (FEL-13-22021-OSP)
- Hall D Solenoid Power Supply Test and Maintenance (-13-21781-OSP)
- Full list of procedures for the solenoid can be found under Solenoid Expert Documentation
- Training for Work in the FCAL Dark Room (D00000-01-06-P006)
- Installation/Removal of FDC (Bill Crahen).
- Hall D Vacuum-Thin Window Procedures (Tom Carstens)
DRAFT Procedures
There are several procedures that are being developed for preparing equipment or for special operations in Hall D. They are provided here for reference, as they may contain useful information. However, they have not yet completed the approval process. Once approved, they are to be performed only by qualified personnel as specified in the reviewed procedure:
- Hall D CDC Installation Procedure - signature approval underway (Tim Whitlatch)
- Hall D Detector Gas System Purge Procedure - final draft (Dave Butler)
- Cryogenic target. Will not be used during 2014 commissioning (Chris Keith)