Difference between revisions of "Collect More Regular Data"
From Hall D Ops Wiki
(→Collect More Regular Data) |
|||
Line 2: | Line 2: | ||
# Goal: Collect data for calibration and characterization of the detector. | # Goal: Collect data for calibration and characterization of the detector. | ||
# Responsibility: HallD | # Responsibility: HallD | ||
+ | * Expected Schedule: | ||
+ | ** Oct 20 - Oct 31 : 12 days | ||
# Conditions: | # Conditions: | ||
#* Tagger hall equipment in place and operating. | #* Tagger hall equipment in place and operating. | ||
#* Beam 50nA CW | #* Beam 50nA CW | ||
#* Radiator is 10<sup>-4</sup>. | #* Radiator is 10<sup>-4</sup>. | ||
− | #* Collimator hole is | + | #* Collimator hole is 5 mm. |
#* Solenoid 1200A. | #* Solenoid 1200A. | ||
#* GlueX detectors are on. | #* GlueX detectors are on. | ||
− | #* Thin commissioning | + | #* Thin commissioning targets at various positions. |
# Activities | # Activities | ||
#* If time permits, and all other tasks are done | #* If time permits, and all other tasks are done |
Revision as of 19:52, 22 August 2014
Collect More Regular Data
- Goal: Collect data for calibration and characterization of the detector.
- Responsibility: HallD
- Expected Schedule:
- Oct 20 - Oct 31 : 12 days
- Conditions:
- Tagger hall equipment in place and operating.
- Beam 50nA CW
- Radiator is 10-4.
- Collimator hole is 5 mm.
- Solenoid 1200A.
- GlueX detectors are on.
- Thin commissioning targets at various positions.
- Activities
- If time permits, and all other tasks are done
- Take enough data for preliminary calibration and alignment of the detector. At least one week of running.