Collect More Regular Data

From Hall D Ops Wiki
Revision as of 19:52, 22 August 2014 by Gen (Talk | contribs) (Collect More Regular Data)

Jump to: navigation, search

Collect More Regular Data

  1. Goal: Collect data for calibration and characterization of the detector.
  2. Responsibility: HallD
  • Expected Schedule:
    • Oct 20 - Oct 31 : 12 days
  1. Conditions:
    • Tagger hall equipment in place and operating.
    • Beam 50nA CW
    • Radiator is 10-4.
    • Collimator hole is 5 mm.
    • Solenoid 1200A.
    • GlueX detectors are on.
    • Thin commissioning targets at various positions.
  2. Activities
    • If time permits, and all other tasks are done
    • Take enough data for preliminary calibration and alignment of the detector. At least one week of running.

Back to main Fall14 commissioning page