Difference between revisions of "DIRC Expert Instructions"

From Hall D Ops Wiki
Jump to: navigation, search
(Fixes to complicated Issues)
(Installation and uninstallation of South DIR Box c2r18)
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
= Instruction on Special Procedures and Operations =
 
= Instruction on Special Procedures and Operations =
  
[[Threshold Scan Procedure]]
+
* [[Threshold Scan Procedure]]
  
[[LED Run Procedure]]
+
* [[LED Run Procedure]]
  
 
= Fixes to complicated Issues =
 
= Fixes to complicated Issues =
[[File:status_of_voltage.png]|thumb|400px]
+
[[File:status_of_voltage.png|thumb|400px]]
 +
Symptom of the problem:
 +
 
 +
= Solution =
 +
 
 +
* General -> Status of Voltages and then “RESET INTERLOCK” for D2_8_MID (picture below).
 +
 
 +
 
 +
= Installation and uninstallation of South DIR  Box c2r18=
 +
 
 +
<p style="color:red"> Since the incorrect installation/removal process will cause serious damage to the fiber or PMT, as the first step of this operation, one must obtain permission from Justin Stevens.</p>
 +
* Due to the fact the South DIRC box c2r18 doesn't have RTV cookie, therefore, a special installation and uninstallation procedure is required, installation is given: https://logbooks.jlab.org/entry/3860930. (This is for documentation only donot use)
 +
* See update-to-date instruction: https://logbooks.jlab.org/entry/3862103

Latest revision as of 15:50, 8 January 2021

Instruction on Special Procedures and Operations

Fixes to complicated Issues

Status of voltage.png

Symptom of the problem:

Solution

  • General -> Status of Voltages and then “RESET INTERLOCK” for D2_8_MID (picture below).


Installation and uninstallation of South DIR Box c2r18

Since the incorrect installation/removal process will cause serious damage to the fiber or PMT, as the first step of this operation, one must obtain permission from Justin Stevens.