Difference between revisions of "DIRC Expert Instructions"
From Hall D Ops Wiki
(→Fixes to complicated Issues) |
(→Installation and uninstallation of South DIR Box c2r18) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 12: | Line 12: | ||
* General -> Status of Voltages and then “RESET INTERLOCK” for D2_8_MID (picture below). | * General -> Status of Voltages and then “RESET INTERLOCK” for D2_8_MID (picture below). | ||
+ | |||
+ | |||
+ | = Installation and uninstallation of South DIR Box c2r18= | ||
+ | |||
+ | <p style="color:red"> Since the incorrect installation/removal process will cause serious damage to the fiber or PMT, as the first step of this operation, one must obtain permission from Justin Stevens.</p> | ||
+ | * Due to the fact the South DIRC box c2r18 doesn't have RTV cookie, therefore, a special installation and uninstallation procedure is required, installation is given: https://logbooks.jlab.org/entry/3860930. (This is for documentation only donot use) | ||
+ | * See update-to-date instruction: https://logbooks.jlab.org/entry/3862103 |
Latest revision as of 15:50, 8 January 2021
Contents
Instruction on Special Procedures and Operations
Fixes to complicated Issues
Symptom of the problem:
Solution
- General -> Status of Voltages and then “RESET INTERLOCK” for D2_8_MID (picture below).
Installation and uninstallation of South DIR Box c2r18
Since the incorrect installation/removal process will cause serious damage to the fiber or PMT, as the first step of this operation, one must obtain permission from Justin Stevens.
- Due to the fact the South DIRC box c2r18 doesn't have RTV cookie, therefore, a special installation and uninstallation procedure is required, installation is given: https://logbooks.jlab.org/entry/3860930. (This is for documentation only donot use)
- See update-to-date instruction: https://logbooks.jlab.org/entry/3862103