Drift Chamber Alignment
- Goal: Collect data with no or low field.
- Responsibility: HallD
- Expected Schedule:
- Nov 6 - Nov 9 : 4 days
- Conditions:
- Tagger hall equipment in place and operating.
- Beam 50nA CW
- Radiator is 0.2 - 1.0 10-4 RL, depending on the FDC and trigger rates.
- Collimator hole is 5 mm.
- Solenoid 0-300A depending on backgrounds.
- GlueX detectors are on.
- Thin commissioning targets at various positions.
- Activities