Difference between revisions of "Drift Chamber Alignment"
From Hall D Ops Wiki
(→Drift Chamber Alignment) |
|||
Line 2: | Line 2: | ||
# Goal: Collect data with no or low field. | # Goal: Collect data with no or low field. | ||
# Responsibility: HallD | # Responsibility: HallD | ||
− | * Expected Schedule: | + | * Expected Schedule: See start dates in the run coordination meeting pages [https://halldweb1.jlab.org/wiki/index.php/Run_Coordination_Meetings#Meeting_General_Agenda here] and the general schedule [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan#Run_Plan here]: Duration of the Drift Chamber Alignment : 4 days |
− | + | ||
# Conditions: | # Conditions: | ||
#* Tagger hall equipment in place and operating. | #* Tagger hall equipment in place and operating. |
Latest revision as of 10:18, 20 October 2014
Drift Chamber Alignment
- Goal: Collect data with no or low field.
- Responsibility: HallD
- Expected Schedule: See start dates in the run coordination meeting pages here and the general schedule here: Duration of the Drift Chamber Alignment : 4 days
- Conditions:
- Tagger hall equipment in place and operating.
- Beam 50nA CW
- Radiator is 0.2 - 1.0 10-4 RL, depending on the FDC and trigger rates.
- Collimator hole is 5 mm.
- Solenoid 0-300A depending on backgrounds.
- GlueX detectors are on.
- Thin commissioning targets at various positions.
- Activities
- If time permits, collect data with target in several positions.