Difference between revisions of "Drift Chamber Alignment"
From Hall D Ops Wiki
(→Main Page) |
|||
Line 1: | Line 1: | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==Drift Chamber Alignment== | ==Drift Chamber Alignment== | ||
# Goal: Collect data with no or low field. | # Goal: Collect data with no or low field. | ||
Line 21: | Line 13: | ||
#* If time permits, collect data with target in several positions. | #* If time permits, collect data with target in several positions. | ||
− | + | [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Back to main Fall14 commissioning page] |
Revision as of 10:12, 21 August 2014
Drift Chamber Alignment
- Goal: Collect data with no or low field.
- Responsibility: HallD
- Conditions:
- Tagger hall equipment in place and operating.
- Beam 50nA CW
- Radiator is 10-4.
- Collimator hole is 3.5mm.
- Solenoid 0-300A depending on backgrounds.
- GlueX detectors are on.
- Thin commissioning target at various positions.
- Activities
- If time permits, collect data with target in several positions.