Difference between revisions of "Drift Chamber Alignment"
From Hall D Ops Wiki
(→Drift Chamber Alignment) |
(→Drift Chamber Alignment) |
||
Line 2: | Line 2: | ||
# Goal: Collect data with no or low field. | # Goal: Collect data with no or low field. | ||
# Responsibility: HallD | # Responsibility: HallD | ||
+ | * Expected Schedule: | ||
+ | ** Oct 16 - Oct 19 : 4 days | ||
# Conditions: | # Conditions: | ||
#* Tagger hall equipment in place and operating. | #* Tagger hall equipment in place and operating. |
Revision as of 19:50, 22 August 2014
Drift Chamber Alignment
- Goal: Collect data with no or low field.
- Responsibility: HallD
- Expected Schedule:
- Oct 16 - Oct 19 : 4 days
- Conditions:
- Tagger hall equipment in place and operating.
- Beam 50nA CW
- Radiator is 0.2 - 1.0 10-4 RL, depending on the FDC and trigger rates.
- Collimator hole is 5 mm.
- Solenoid 0-300A depending on backgrounds.
- GlueX detectors are on.
- Thin commissioning targets at various positions.
- Activities
- If time permits, collect data with target in several positions.