Difference between revisions of "Fall 2016 GlueX Run"

From Hall D Ops Wiki
Jump to: navigation, search
m (Gen moved page Current run to Fall 2016 GlueX Run: restructure)
(Run Configuration:)
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
=Current run information=
 
  
==Fall 2016 GlueX production run==
+
==General Information==
  
*[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Fall_2016_Run Fall 2016 Running Plan]
+
* Experiment: GlueX [https://misportal.jlab.org/mis/physics/experiments/searchProposals.cfm?paramHall=D&paramExperimentEnergy=12GeV&paramExperimentStatusList=A,G E12-06-102] Production
 +
* Planned tests:
 +
** High-intensity GlueX test (invasive, 3 shifts)
 +
** ComCAL(PrimeX) prototype test (parasitic)
 +
* 2016/10/08 - 2016/12/21, 65 days; see [https://www.jlab.org/div_dept/physics_division/experiments/schedule.html Accelerator Schedule]
 
*[https://halldweb.jlab.org/hdops/wiki/index.php/Main_Page Information for shift takers]
 
*[https://halldweb.jlab.org/hdops/wiki/index.php/Main_Page Information for shift takers]
*[https://halldweb.jlab.org/hdops/wiki/index.php/Training_and_Documentation_Shift Safety documents and training links]
 
 
*[https://www.jlab.org/Hall-D/shifts/ Shift schedule]
 
*[https://www.jlab.org/Hall-D/shifts/ Shift schedule]
 
*[https://logbooks.jlab.org/book/hdlog Hall D run logbook (HDLOG)]
 
*[https://logbooks.jlab.org/book/hdlog Hall D run logbook (HDLOG)]
  
==Run configuration:==
+
==Run Configuration==
  
 
* Beam energy: 11.632 GeV
 
* Beam energy: 11.632 GeV
 
* Solenoid on at 1350A.  
 
* Solenoid on at 1350A.  
* Beam current: CW 1 nA-1.5 μA. 250 MHz frequency.  
+
* Beam current: CW 1 nA-2μA, 250 MHz frequency. See [https://www.jlab.org/Hall-D/hd_safety.php/RSAD.pdf RSAD] for the RadCon limitations.  
**Goniometer diamond radiators: <font color="red">TBD. Specific meeting to discuss this to come</font>. We presently have test diamonds:
+
** Regular running: 150 nA on 4.1&middot;10<sup>-4</sup> radiator
***J1a50 (50 μm, 4.1&middot;10<sup>-4</sup> R.L.),
+
** High intensity tests: 3 shifts at 1 &micro;A on 4.1&middot;10<sup>-4</sup> radiator
***JD70-118 (20 μm, 1.6&middot;10<sup>-4</sup> R.L.), middot;10<sup>-4</sup> R.L.),
+
* Diamond radiators:
***JD70-119 (20 μm, 1.6&middot;10<sup>-4</sup> R.L.), middot;10<sup>-4</sup> R.L.),
+
**J1a50 &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;(50 μm - 4.1&middot;10<sup>-4</sup> R.L., 4&times;4 mm&sup2;) - old crystal - excellent rocking curve
**and possibly some new diamonds
+
**JD70-100 (58 μm - 4.8&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - new crystal - excellent rocking curve
***J70-100 (55 μm, 4.5&middot;10<sup>-4</sup> R.L.),
+
**JD70-105 (47 μm - 3.9&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - new crystal - good rocking curve
***J70-105 (60 μm, 4.9&middot;10<sup>-4</sup> R.L.),  
+
**JD70-104 (17 μm - 1.4&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - new crystal - wider rocking curve - marginally usable
***JD70-104 (23 μm, 1.6&middot;10<sup>-4</sup> R.L.), middot;10<sup>-4</sup> R.L.),
+
***JD70-108 (17 μm, 1.6&middot;10<sup>-4</sup> R.L.), middot;10<sup>-4</sup> R.L.),
+
  
 
*Tagger quadrupole on (-4.2 A).  
 
*Tagger quadrupole on (-4.2 A).  
* Collimator hole: Both 5 mm diameter and 3.4 mm diameter. Default running: 5.0 mm
+
* Collimator hole: 5 mm diameter with &asymp;50 &micro;m diamond radiators, may use 3.4 mm diameter with &asymp;20 &micro;m diamonds
* Target: LH2 target: [https://hdops.jlab.org/wiki/index.php/Cryogenic_Target_Shift cryogenic target]
+
* Target: LH2 target
  
==Schedule for the Spring 2016 run==
+
==Schedule Details==
  
 
# Oct. 1st-Oct. 7th: Electron beam restoration
 
# Oct. 1st-Oct. 7th: Electron beam restoration
Line 51: Line 51:
 
**PDL, Benedikt Zihlmann
 
**PDL, Benedikt Zihlmann
  
==Previous run periods:==
+
==Detailed Running Plan==
* [[Fall 2014 Commissioning Plan]]. [http://argus.phys.uregina.ca/gluex/DocDB/0026/002649/001/Fall14_run_summary.pdf Summary of the Fall 2014 run given at the GlueX collaboration meeting, Feb. 2015.]
+
*[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Fall_2016_Run Run Coordination Meetings]
* [[Spring 2015 Commissioning Plan]]. [http://argus.phys.uregina.ca/gluex/DocDB/0027/002712/001/Spring15_run_summary.pdf Summary of the Spring 2015 run given at the GlueX collaboration meeting, May 2015.]
+
*[https://halldweb.jlab.org/wiki/index.php/Fall_2015_Commissioning_Plan Fall 2015 Commissioning Plan] [http://argus.phys.uregina.ca/gluex/DocDB/0029/002930/002/spring15_run_summary.pdf Summary of the Fall 2015 run (and start of the the Spring 2016 run) given at the GlueX collaboration meeting, Feb. 2016.]
+
*[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2016_Run Spring 2016 Commissioning Plan] [http://argus.phys.uregina.ca/gluex/DocDB/0030/003009/001/Spring16_run_summary.pdf Summary of the Fall 2015 run (and the Spring 2016 run) given at the GlueX collaboration meeting, May 2016.], [http://argus.phys.uregina.ca/gluex/DocDB/0029/002930/002/spring15_run_summary.pdf Summary of the start of the Spring 2016 run (and the Fall 2015 run) given at the GlueX collaboration meeting, Feb. 2016.]
+
*[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Fall_2016_Run Fall 2016 Running Plan]
+

Latest revision as of 07:49, 30 September 2016

General Information

Run Configuration

  • Beam energy: 11.632 GeV
  • Solenoid on at 1350A.
  • Beam current: CW 1 nA-2μA, 250 MHz frequency. See RSAD for the RadCon limitations.
    • Regular running: 150 nA on 4.1·10-4 radiator
    • High intensity tests: 3 shifts at 1 µA on 4.1·10-4 radiator
  • Diamond radiators:
    • J1a50       (50 μm - 4.1·10-4 R.L., 4×4 mm²) - old crystal - excellent rocking curve
    • JD70-100 (58 μm - 4.8·10-4 R.L., 7×7 mm²) - new crystal - excellent rocking curve
    • JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) - new crystal - good rocking curve
    • JD70-104 (17 μm - 1.4·10-4 R.L., 7×7 mm²) - new crystal - wider rocking curve - marginally usable
  • Tagger quadrupole on (-4.2 A).
  • Collimator hole: 5 mm diameter with ≈50 µm diamond radiators, may use 3.4 mm diameter with ≈20 µm diamonds
  • Target: LH2 target

Schedule Details

  1. Oct. 1st-Oct. 7th: Electron beam restoration
  2. Oct. 8th-Nov. 22nd: Hall D Fall run, part 1.
  3. Nov. 23rd-Nov. 27th: Thanksgiving break.
  4. Nov. 28th-Dec. 18th: Hall D Fall run, part 2 (includes 2 day of beam restoration).
  5. Dec. 19th-Dec. 21st: TBD
  6. Every Tuesdays: 12h of beam study. Every Thursdays, if necessary: 8h of RF recovery.

List of Run Coordinators and Physics Division Liaison

  • RCs:
    • Sat. Oct. 1 - Fir. Oct. 7 (7 days): Alexandre Deur (accelerator restoration)
    • Sat. Oct. 8 - Wed. Oct. 19 (11 days): Alexandre Deur
    • Wed. Oct. 19 - Wed. Nov. 2 (14 days): Mark Dalton
    • Wed. Nov. 2 - Wed. Nov. 16 (14 days): Paul Eugenio
    • Wed. Nov. 16 - Wed. Nov. 23: (7 days): Naomi Jarvis
    • Wed. Nov. 23 - Sun. Nov. 27: (4 days): Thanksgiving shutdown: very likely RC not necessary
    • Sun. Nov. 27 - Wed. Dec. 7: (10 days): Adesh Subedi
    • Wed. Dec. 7 - Mon. Dec. 19: (12 days): David Lawrence
    • Mon. Dec. 19 - Wed. Dec. 21: (2 days): If RC necessary, TBD
    • PDL, Benedikt Zihlmann

Detailed Running Plan