Difference between revisions of "Post-thanksgiving period"

From Hall D Ops Wiki
Jump to: navigation, search
(Fill in more on DAQ testing)
(Post-thanksgiving period)
Line 4: Line 4:
 
* '''Prerequisites''':
 
* '''Prerequisites''':
 
# Hall D detectors on.  
 
# Hall D detectors on.  
# Solenoid magnetic field at 800A. Pair Spec. Magnetic field at nominal current (991A).  Sweeping magnet on at 190A.
+
# Solenoid magnetic field at 800A. Pair Spec. Magnetic field at nominal current (991A, initially 1238A for 5 min for hysteresis purpose).  Sweeping magnet on at 190A.
 
# Monitoring available in counting room:
 
# Monitoring available in counting room:
 
#* DAQ screens  
 
#* DAQ screens  
Line 16: Line 16:
  
 
* '''Run plan''':
 
* '''Run plan''':
# re-establish beam:
+
# re-establish beam <span style="color:red> done </span>. (If beam is down for a significant time (e.g. a shift), beam need to be re-established following the procedure below.)
 
#*Initial conditions:
 
#*Initial conditions:
 
#** Collimator in blocking conditions.  
 
#** Collimator in blocking conditions.  
Line 22: Line 22:
 
#** No Radiator.  
 
#** No Radiator.  
 
#***[[Tagging_Spectrometer_Shift#Move_Amorphous_Radiator | Procedure for moving amorphous radiator]]
 
#***[[Tagging_Spectrometer_Shift#Move_Amorphous_Radiator | Procedure for moving amorphous radiator]]
# Request 50 nA CW beam.
+
# Request 50 nA CW beam. <span style="color:red> done </span>
## Check that radiation levels (tagger, collimator cave) are good.
+
## Check that radiation levels (tagger, collimator cave) are good. <span style="color:red> done, see [https://logbooks.jlab.org/entry/3310576 log entry 3310576] </span>
 
##* Typical levels are (for radiator retracted, collimator fully blocking, electron beam current 61.50 nA)
 
##* Typical levels are (for radiator retracted, collimator fully blocking, electron beam current 61.50 nA)
 
##**RAD102_P1= 0.170 mrad/hr (tagger area, gammas, between tagger and dump)
 
##**RAD102_P1= 0.170 mrad/hr (tagger area, gammas, between tagger and dump)
Line 29: Line 29:
 
##**RAD102_P3= 0.080 mrem/hr (tagger area, neutrons, near electronics racks)
 
##**RAD102_P3= 0.080 mrem/hr (tagger area, neutrons, near electronics racks)
 
##**RAD101_P1= 0.006 mrad/hr (collimator cave, gammas)
 
##**RAD101_P1= 0.006 mrad/hr (collimator cave, gammas)
## Insert 2*10^-5 radiator. Insert 5mm collimator. Ramp-up solenoid to 1200A (call mechanical on-call. If it is during the night, the magnet can wait: we do not need 1200A until the BCal data taking, step 9). Check beam position on the Active collimator. Check that radiation levels are good. Run for 7min to gather enough data for radiation level studies.
+
## Insert 2*10^-5 radiator. Insert 5mm collimator. Ramp-up solenoid to 1200A (call mechanical on-call. If it is during the night, the magnet can wait: we do not need 1200A until the BCal data taking, step 9). Check beam position on the Active collimator. Check that radiation levels are good. Run for 7min to gather enough data for radiation level studies. <span style="color:red> done, see [https://logbooks.jlab.org/entry/3310576 log entry 3310576] </span>
 
##* Typical levels are (for 2*10^-5 radiator, electron beam current 48 [67.5] nA)
 
##* Typical levels are (for 2*10^-5 radiator, electron beam current 48 [67.5] nA)
 
##**RAD102_P1= 3.500 [4.10] mrad/hr (tagger area, gammas, between tagger and dump)
 
##**RAD102_P1= 3.500 [4.10] mrad/hr (tagger area, gammas, between tagger and dump)
Line 36: Line 36:
 
##**RAD101_P1= 9.700 [14.0] mrad/hr (collimator cave, gammas)
 
##**RAD101_P1= 9.700 [14.0] mrad/hr (collimator cave, gammas)
 
## Check the beam position at the profiler.
 
## Check the beam position at the profiler.
#Radiation level studies (0.5h):  
+
#Radiation level studies (0.5h): <span style="color:red> done, see [https://logbooks.jlab.org/entry/3310576 log entry 3310576] </span>
 
#* Run 7 min without  radiator (Call MCC and ask to mask the FSD each time the radiator is moved). Beam current: 50nA
 
#* Run 7 min without  radiator (Call MCC and ask to mask the FSD each time the radiator is moved). Beam current: 50nA
 
#* Run 7 min with the 10^-4  radiator (Call MCC). Beam current: 50nA
 
#* Run 7 min with the 10^-4  radiator (Call MCC). Beam current: 50nA
 
#* Run 7 min with the 3*10^-4  radiator (Call MCC). Beam current: 50nA
 
#* Run 7 min with the 3*10^-4  radiator (Call MCC). Beam current: 50nA
 
#* Insert the 2*10^-5  radiator (Call MCC).  
 
#* Insert the 2*10^-5  radiator (Call MCC).  
# 2D scans (x: motor scan, y: beam scan) on the active collimator. Alex Barnes. 2h
+
# 2D scans (x: motor scan, y: beam scan) on the active collimator. Alex Barnes. 2h <span style="color:red> done, see [https://logbooks.jlab.org/entry/3310677 log entry 3310677]  </span>
# Meanwhile, monitor the rate at the active target. Determine the beam position for maximal photon beam transmission. Log the corresponding 4 active collimator values.
+
# Meanwhile, monitor the rate at the active target. Determine the beam position for maximal photon beam transmission. Log the corresponding 4 active collimator values. <span style="color:red> done, see [https://logbooks.jlab.org/entry/3310576 log entry 3310576] </span>
# Check background level in the pair spectrometer. Alex Somov. 0.5h
+
# Check background level in the pair spectrometer. Alex Somov. 0.5h <span style="color:red> done, see [https://logbooks.jlab.org/entry/3310753 log entry 3310753] </span>
 
# DAQ Test Sergei Furletov 4h
 
# DAQ Test Sergei Furletov 4h
 
#* Increase stability of DAQ system
 
#* Increase stability of DAQ system
Line 50: Line 50:
 
#* Standard trigger optimization 4h
 
#* Standard trigger optimization 4h
 
#* ST&TOF trigger study 3h
 
#* ST&TOF trigger study 3h
 +
#** <span style="color:red> TOF trigger study partly done (1h), see [https://logbooks.jlab.org/entry/3310760 log entry 3310760] </span>
 
#* BCal&FCal energy balance trigger study 1h
 
#* BCal&FCal energy balance trigger study 1h
 
# BCal data taking with BCal trigger. (2*10^-5 radiator, 50 nA CW beam) Elton. 2h
 
# BCal data taking with BCal trigger. (2*10^-5 radiator, 50 nA CW beam) Elton. 2h
Line 63: Line 64:
 
#*Run with pair spec. data mixed with GlueX detector data. 0.5h
 
#*Run with pair spec. data mixed with GlueX detector data. 0.5h
 
#When trigger/DAQ are optimized, take as much data as possible to increase FCal statistics. Manuel Lara. Time: until Dec. 22nd
 
#When trigger/DAQ are optimized, take as much data as possible to increase FCal statistics. Manuel Lara. Time: until Dec. 22nd
 +
#*<span style="color:red> Partly done on 12/04/14 owl shift: 4h of data, see [https://logbooks.jlab.org/entry/3310750 log entry 3310750] </span>
 
[https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Back to main Fall14 commissioning page]
 
[https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Back to main Fall14 commissioning page]

Revision as of 08:02, 5 December 2014

Post-thanksgiving period

  • Goal: Continue detector/trigger/DAQ checkout
  • Prerequisites:
  1. Hall D detectors on.
  2. Solenoid magnetic field at 800A. Pair Spec. Magnetic field at nominal current (991A, initially 1238A for 5 min for hysteresis purpose). Sweeping magnet on at 190A.
  3. Monitoring available in counting room:
  4. 1 cm CH2 target in nominal target position.
  • Run plan:
  1. re-establish beam done . (If beam is down for a significant time (e.g. a shift), beam need to be re-established following the procedure below.)
  2. Request 50 nA CW beam. done
    1. Check that radiation levels (tagger, collimator cave) are good. done, see log entry 3310576
      • Typical levels are (for radiator retracted, collimator fully blocking, electron beam current 61.50 nA)
        • RAD102_P1= 0.170 mrad/hr (tagger area, gammas, between tagger and dump)
        • RAD102_P2= 0.480 mrad/hr (tagger area, gammas, near electronics racks)
        • RAD102_P3= 0.080 mrem/hr (tagger area, neutrons, near electronics racks)
        • RAD101_P1= 0.006 mrad/hr (collimator cave, gammas)
    2. Insert 2*10^-5 radiator. Insert 5mm collimator. Ramp-up solenoid to 1200A (call mechanical on-call. If it is during the night, the magnet can wait: we do not need 1200A until the BCal data taking, step 9). Check beam position on the Active collimator. Check that radiation levels are good. Run for 7min to gather enough data for radiation level studies. done, see log entry 3310576
      • Typical levels are (for 2*10^-5 radiator, electron beam current 48 [67.5] nA)
        • RAD102_P1= 3.500 [4.10] mrad/hr (tagger area, gammas, between tagger and dump)
        • RAD102_P2= 9.900 [12.0] mrad/hr (tagger area, gammas, near electronics racks)
        • RAD102_P3= 0.500 [0.75] mrem/hr (tagger area, neutrons, near electronics racks)
        • RAD101_P1= 9.700 [14.0] mrad/hr (collimator cave, gammas)
    3. Check the beam position at the profiler.
  3. Radiation level studies (0.5h): done, see log entry 3310576
    • Run 7 min without radiator (Call MCC and ask to mask the FSD each time the radiator is moved). Beam current: 50nA
    • Run 7 min with the 10^-4 radiator (Call MCC). Beam current: 50nA
    • Run 7 min with the 3*10^-4 radiator (Call MCC). Beam current: 50nA
    • Insert the 2*10^-5 radiator (Call MCC).
  4. 2D scans (x: motor scan, y: beam scan) on the active collimator. Alex Barnes. 2h done, see log entry 3310677
  5. Meanwhile, monitor the rate at the active target. Determine the beam position for maximal photon beam transmission. Log the corresponding 4 active collimator values. done, see log entry 3310576
  6. Check background level in the pair spectrometer. Alex Somov. 0.5h done, see log entry 3310753
  7. DAQ Test Sergei Furletov 4h
    • Increase stability of DAQ system
    • Identify bottlenecks in system and optimize to increase maximum rate
  8. Trigger tests. Alex Somov
    • Standard trigger optimization 4h
    • ST&TOF trigger study 3h
    • BCal&FCal energy balance trigger study 1h
  9. BCal data taking with BCal trigger. (2*10^-5 radiator, 50 nA CW beam) Elton. 2h
  10. Take data at 12 and 24 deg C. (>2 hours each to accumulate statistics and also study stability. Take data with BCAL trigger. Each 3 temperature changes (18->12, 12->24, 24->18) requires an access. Elton. 9h. (We can postponed this step to later to take advantage of an access).
  11. High luminosity run for CDC (same luminosity as for April 2015 run, except for the collimator size). (3*10^-4 radiator, 130 nA beam) Beni. 2h
  12. Staying in the same high luminosity conditions as above, run 1h with 3mm collimator, if the beam position has been stable (~mm drifts at most). Meabwhile, run pair spec DAQ and check its background level. Beni/Alex Somov. 1h
    • Warn MCC that the beam position given by the active collimator is now irrelevant as long as our 3mm collimator is in place. Beam position stability should be checked on AD00.
    • Monitor beam position on AD00 and 5C11 BPMs.
    • Monitor rates at the active target and profiler.
  13. Pair Spectrometer studies (Alex Somov)
    • Go the following conditions: 2*10^-5 radiator, 150 nA beam, 5mm collimator. Insert thickest pair spec. convertor
    • Take pair spec. data with TagH and TagM. 3h
    • Run with pair spec. data mixed with GlueX detector data. 0.5h
  14. When trigger/DAQ are optimized, take as much data as possible to increase FCal statistics. Manuel Lara. Time: until Dec. 22nd

Back to main Fall14 commissioning page