Difference between revisions of "Procedure installing solid target"

From Hall D Ops Wiki
Jump to: navigation, search
(Procedure:)
(Procedure:)
Line 11: Line 11:
 
#Remove the beam profiler if necessary
 
#Remove the beam profiler if necessary
 
#Put protective cover on the beam pipe vacuum window
 
#Put protective cover on the beam pipe vacuum window
#Take the the target tube with the desired target mounted on it. See a picture of the target tube: [[Media: target_tube.jpg]]
+
#Take the the target tube with the desired target mounted on it. See a picture of the target tube: [[Media: 04.jpg]]

Revision as of 17:08, 12 September 2014

Procedure to install/change solid targets

Experts: Matt Marchlik, Alexandre Deur, Tim Withlatch

Two persons are necessary for the task. Ask Tom Carstens ahead of time for the beam pipe vacuum window protective cover.

Procedure:

  1. If needed, request Radiological survey of the target area
  2. Remove the beam profiler if necessary
  3. Put protective cover on the beam pipe vacuum window
  4. Take the the target tube with the desired target mounted on it. See a picture of the target tube: Media: 04.jpg