Difference between revisions of "Procedure installing solid target"
From Hall D Ops Wiki
(→Procedure:) |
(→Procedure:) |
||
Line 11: | Line 11: | ||
#Remove the beam profiler if necessary | #Remove the beam profiler if necessary | ||
#Put protective cover on the beam pipe vacuum window | #Put protective cover on the beam pipe vacuum window | ||
− | #Take the the target tube with the desired target mounted on | + | #Take the the target tube with the desired target mounted on the white thiner plastic end. (See a picture of the target tube: [[Media: 04.jpg]]) |
+ | #Bend the beam line slightly of axis (about 1 degree) to be able to slide the target tube in the target support tube | ||
+ | #Meanwhile, slide the target tube in the support tube (See a picture of the support tube: [[Media: 04.jpg]]) |
Revision as of 17:11, 12 September 2014
Procedure to install/change solid targets
Experts: Matt Marchlik, Alexandre Deur, Tim Withlatch
Two persons are necessary for the task. Ask Tom Carstens ahead of time for the beam pipe vacuum window protective cover.
Procedure:
- If needed, request Radiological survey of the target area
- Remove the beam profiler if necessary
- Put protective cover on the beam pipe vacuum window
- Take the the target tube with the desired target mounted on the white thiner plastic end. (See a picture of the target tube: Media: 04.jpg)
- Bend the beam line slightly of axis (about 1 degree) to be able to slide the target tube in the target support tube
- Meanwhile, slide the target tube in the support tube (See a picture of the support tube: Media: 04.jpg)