Difference between revisions of "Procedure installing solid target"

From Hall D Ops Wiki
Jump to: navigation, search
(Procedure:)
(Procedure:)
Line 17: Line 17:
 
#* log into wiki (top right button)
 
#* log into wiki (top right button)
 
#* Edit the "Target History" section (click on the button to the right of the title)
 
#* Edit the "Target History" section (click on the button to the right of the title)
#* copy and past a line of the wikitable and fill in the proper information. The Target Types index is given on the same page.
+
#* Copy and past a line of the wikitable and fill in the proper information. The Target Types index is given on the same page.

Revision as of 16:35, 13 October 2014

Procedure to install/change solid targets

Experts: Matt Marchlik, Alexandre Deur, Tim Withlatch

Procedure:

hose clamp
  1. If needed, request Radiological survey of the target area.
  2. Remove the beam profiler if necessary.
  3. Open the two hose clamps holding the beam tube to the fixed V-blocks, see 1st picture.
  4. Spin the jack adjustment nut on the adjustable V-block rest until the beam line is high enough to allow the target mount tube to be easily removed. See the jack on the 2nd picture.
    Beam Line jack
  5. Remove the target mount tube. Make sure you support it horizontally to not break the thin white extremity of the tube (fragile) , see 3rd photo showing the white extremity:
    White tube extremity (fragile)
  6. Remove the current target and replace it with the desired one. The targets are stored in a yellow plastic bin attached to one of the beam line post.
  7. Insert the target mount tube. Make sure you support it horizontally to not break the thin white extremity of the tube (fragile). Slide it up to the nominal target Z-position marked by a white ring painted on the target tube. If the orientation of the target matters (e.g. we are using the Cross target or the Triangle target), align the black line on the target tube to the black line on the support tube. See 4th picture.
    Orientation marks
  8. Lower the beam line down onto the two fixed V-blocks by spinning the adjustment nut on the adjustable V-block rest. Spin the nut a couple of times further to ensure the temporary V-block is not in contact with the beam line.
  9. If necessary, Reinstall the profiler.
  10. Update database to reflect the target change: procedure to update the target status in the database. To do this, go here and follow the procedure:
    • log into wiki (top right button)
    • Edit the "Target History" section (click on the button to the right of the title)
    • Copy and past a line of the wikitable and fill in the proper information. The Target Types index is given on the same page.