Difference between revisions of "RC Helpsheet"
From Hall D Ops Wiki
Line 17: | Line 17: | ||
* Keep track of BANU time, will need to present it. Alexandre keeps track of the total % of time used and data collected. | * Keep track of BANU time, will need to present it. Alexandre keeps track of the total % of time used and data collected. | ||
* [https://cebaf.jlab.org/pd/run-coordinator-reports Summary for MCC 13:30 Wed] | * [https://cebaf.jlab.org/pd/run-coordinator-reports Summary for MCC 13:30 Wed] | ||
− | * [https://accweb.acc.jlab.org/btm/reports/beam-time-summary | + | * [https://accweb.acc.jlab.org/btm/reports/beam-time-summary Accelerator beam time summary for the week (pie chart)] |
* [https://halldweb.jlab.org/hdops/wiki/index.php/Hall_D_Runs RC summary] to be sent to Eugene, cc Alexandre Deur (most ppl send them to the collaboration too) | * [https://halldweb.jlab.org/hdops/wiki/index.php/Hall_D_Runs RC summary] to be sent to Eugene, cc Alexandre Deur (most ppl send them to the collaboration too) |
Revision as of 11:47, 17 November 2021
Meetings
Shifts
- Email search page
- If someone does not show up, contact the PDL
- Approval from Eugene is needed to change shift status (cancel/standby)
- Someone must be present if the target is full.
- If the magnet is on, then someone should be in the counting house. If shifts are cancelled then the magnet can stay on if the hall in power permit or beam permit and the crew are instructed not to permit accesses without RC approval. Check with Eugene.
End of the week reports
- Keep track of BANU time, will need to present it. Alexandre keeps track of the total % of time used and data collected.
- Summary for MCC 13:30 Wed
- Accelerator beam time summary for the week (pie chart)
- RC summary to be sent to Eugene, cc Alexandre Deur (most ppl send them to the collaboration too)