MantisBT

View Issue Details Jump to Notes ] Issue History ] Print ]
IDProjectCategoryView StatusDate SubmittedLast Update
0000253Hall D OnlineControlspublic2012-04-24 14:212013-03-19 13:05
Reporterwolin 
Assigned Tocreel 
PrioritynormalSeverityfeatureReproducibilityN/A
StatusresolvedResolutionfixed 
PlatformOSOS Version
Summary0000253: Install ControlNet cable between Hall D and Cryo Service building
DescriptionCommunication between the Hall D and Cryo PLC systems will be done via ControlNet. A cable needs to be installed between the two buildings.
Additional InformationJonathan said he has the cable and connectors. He said his techs will actually install the cable.
TagsNo tags attached.
Work by outside group for Hall DNo
Estimated man-weeks1
Percentage complete0
Actual man-weeks0
Attached Files

- Relationships

-  Notes
(0000368)
wolin (administrator)
2012-05-09 11:32

Best strategy seems to be to run the line to the PLC chassis in Rack Room.
(0000485)
wolin (administrator)
2013-03-19 13:05

We decided this isn't needed. We may install on at a later date.

- Issue History
Date Modified Username Field Change
2012-04-24 14:21 wolin New Issue
2012-04-24 14:21 wolin Work by outside group for Hall D => No
2012-04-24 14:21 wolin Estimated man-weeks => 1
2012-04-24 14:21 wolin Percentage complete => 0
2012-04-24 14:21 wolin Actual man-weeks => 0
2012-04-24 14:25 wolin Status new => assigned
2012-04-24 14:25 wolin Assigned To => creel
2012-04-24 14:25 wolin Additional Information Updated
2012-05-09 11:32 wolin Note Added: 0000368
2013-03-19 13:05 wolin Note Added: 0000485
2013-03-19 13:05 wolin Status assigned => resolved
2013-03-19 13:05 wolin Resolution open => fixed


Copyright © 2000 - 2024 MantisBT Team