Π polarizability Meeting Apr 19, 2023

From GlueXWiki
Jump to: navigation, search

11:00 EST (JLab time) Weekly Meeting

REMOTE during Covid-19

Connecting

Join ZoomGov Meeting
https://jlab-org.zoomgov.com/j/1608628791?pwd=bXhtZjdNRi8xeXZqWFh5T1R3TDBFdz09
Meeting ID: 160 862 8791
Passcode: CPP

David Hornidge is inviting you to a scheduled ZoomGov meeting.

Topic: CPP Weekly Meeting
Time: This is a recurring meeting Meet anytime

Join ZoomGov Meeting
https://jlab-org.zoomgov.com/j/1608628791?pwd=bXhtZjdNRi8xeXZqWFh5T1R3TDBFdz09

Meeting ID: 160 862 8791
Passcode: CPP
One tap mobile
+16692545252,,1608628791# US (San Jose)
+16468287666,,1608628791# US (New York)

Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
Meeting ID: 160 862 8791
Find your local number: https://jlab-org.zoomgov.com/u/acZK7hDWFf
 
Join by SIP
1608628791@sip.zoomgov.com

Join by H.323
161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 160 862 8791
Passcode: 112160

Action Items

Preliminary Agenda

  1. Previous CPP meeting: Apr 12, 2023
  2. Announcements
  3. Action Items
  4. Calibrations
    • TOF: Full calibration complete. Tested one run, looks very good, resolution below 100ps (for mean-time). CCDB will be updated soon.
    • FCAL: ongoing, needs another "month?", currently good to 5% for pi0 width. issues with the innermost ring, no pi0 seen
    • BCAL: ongoing.
    • CDC: calibration is done. Naomi is doing some cross checks.
    • FDC: Keigo, done.
    • CTOF, FMWPC:
      • Digihit integral vs peak 2-d plots for groups of 24 MWPC channels show noise dependence on hit multiplicity in the group.
        plots made for the entire group, file name legend: 1st number - MWPC#, 2nd - 24 wires group #, 3rd - one for 1...2 hits in the group, five for 10 or more hits
    • Tagger-Mic, PS, TPOL: ?
      • ver10: mic. and hod. timining mostly ok., needs some tweaking of individual channels. PS timing itself looks ok however the relative timing between PS and tagger is off by 4ns(always), this inhibits to do and accidental scaling factor calibration. One block of 5 microscope columns are off regarding energy calibration, it seems the ordering is switched (this seems to be also true for the 80k run period and the 110k run period).
    • Accidental Scaling Factor calibration requires Tagger and PS calibration.
  5. CCDB Constants Status (Elton)
  6. Data Analysis
  7. Wiki Page Analysis_Overview
  8. Documentation
  9. Upcoming Presentations
    • SPIN 2023 at Duke
  10. Other business
  11. Next meeting

Minutes

Attending:

Docs/Files

in: /u/group/halld/www/halldweb/html/talks/2023/CPP/ link: This directory is accessible from the web at https://halldweb.jlab.org/talks/2023/CPP