Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 10-Dec-2009 9:45 am ARC 428


Agenda

  • Controls narrative and P&I meeting - Mark W
  • FastTrack schedule status - George, Chuck
  • QWeak area - Tom
  • Bigger door in F117 - Tom
  • Use one PLC chassis for two coils? - Scot
  • Should we have manual valves in control system? - Elliott, Scot, George
  • Which control operations should be automated, which should be done manually? - All
  • Moving power supply dump resistor - Mark S
  • Update on Hall C PLC failure and redundant PLC's - Elliott
  • A-B Point I/O system for RS232 channels and other applications - Elliott
  • Armen to begin wiring effort in F117 - Scot, Elliott
  • Field maps where electronics is located - George, Floyd
  • Status of interface to cryo can - George
  • Status of pressure relief system design - George
  • Status of ordering cryo can - George
  • Platform stand order and delivery schedule - George
  • Ordering remaining controls instrumentation and components - Scot, Elliott
  • PLC programming and testing - Mark W
  • Coil 1 modification and testing - George
  • Coil 2 cost and schedule - George
  • Coil 3 statement of work, visit and IUCF contract - George, Tom
  • Coil 4 controls wiring replacement - George
  • Shipping rails and transportainer from IUCF - Tom
  • Safety reviews: when to start formal process - George, Elliott
  • 5 G contours - George
  • Coil Test Top To-Do items