Coil Test Weekly Meeting 22-Jul-2010
From GlueXWiki
Solenoid Coil Test Weekly Meeting
Location and Time
- Thu 22-Jul-2010 9:30am ARC 428
Agenda
- Moving and F117 status - Scot, Mark S, Elliott
- racks and computers
- power
- networking
- telephone
- Coil test plan - Josh
- Magnet power supply and interlock commissioning - Cody
- flow switches
- insulation of dump resistor, interlocks, etc.
- RS232 connection to power supply
- lock door when magnet ramping down but power supply turned off?
- interlock on strain gauges?
- Controls racks - Scot
- what else is left to do?
- PLC programming/testing status - Mark W
- what else is left to do besides testing?
- UPS status - Mark W, Elliott
- relay modules, use in interlock system
- connection to PLC?
- EPICS <--> PLC communications - Wesley, Elliott
- connection to guard shack
- HMI and EWEB programming - Yi, Elliott
- Installation status - George, Mark S
- rigging status
- cryo can delivery
- broken C-glass sensor in cryo can
- Two weeks notice to Errol
- backup power in Test Lab
- Coil repair status - George
- OSP documents and review - Elliott, George