Coil Test Weekly Meeting 23-Sep-2010

From GlueXWiki
Jump to: navigation, search

Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 23-Sep-2010 9:30am ARC 428


Agenda

  • DOE review 28-Sep - George, Elliott
    • final status for Glenn's talk
    • preparation for visit to Test Lab by reviewers
  • Conduct of Operations - Josh, Elliott
    • results of Wed meeting
  • OSP documents and review - Elliott, George
    • what is left to do?
    • when can/must we turn everything in?
  • Installation status
    • what's left?
    • when do we give two weeks notice to Errol?
  • Test plan - Josh
    • addition of check valve and relief valve in lead flow system
  • Magnet power supply and interlock commissioning - Cody
    • latest status
    • adding a shunt to the interlock system
  • Controls racks - Scot
    • strain gauge interlock
    • UPS interlock
    • anything else?
  • PLC programming/testing status - Mark W
    • UPS interlock
    • guard shack
    • what's left?
    • backup PLC programmer, file locations, license key
    • tutorial?
  • EPICS <--> PLC communications - Hovanes
    • PV list from Jonathan Creel and PLC tags
    • connection to guard shack
    • under what circumstances do we notify the guard shack?
  • HMI and EWEB programming - Yi, Hovanes
    • Josh's screens
    • current status
    • tutorial?
  • Coil repair status - George
  • Solenoid review 25-26 Oct
  • Preparations for testing next coil - George, Elliott
    • update P&I
    • splices
    • yoke location
    • piping adaptors
    • downstream yoke spacers
    • controls racks rewiring



Lehman Review Committee Visit

  • the visit is scheduled for 1pm -2pm Wed 29-Sep
  • currently there are five visitors on Sherry's list, there may be more
  • Tom will have the area ready for visitors by Mon afternoon 27-Sep
  • they will either walk or ride to the Test Lab, not sure yet
  • Tom and I will meet them near the rollup door to the high bay
  • Tom or I will give them a very short safety briefing
  • PPE is not required to visit the coil test area
  • the Test Lab is an industrial building, so there are trip hazards all over the place
  • Tom will eliminate trip hazards in our area as best he can
  • our area is designated ODH 0, which I think means that visitors are allowed if they are chaperoned
  • they will be asked not to wander away from the areas we take them to
  • they will be asked to be careful where they put their hands, heads, feet, and any other valuable body part

then:

  • I (or Eugene? or Elton?) will lead them to the coil test apparatus and give them a brief introduction as to what

they are looking at, how it works, a little history, etc. I'm thinking 5 min or less.

  • after the intro they can ask questions, break off to talk with particular experts, whatever. I assume Eugene,

Elton, George, and Tim (Josh B, too?) will be there to answer questions.