Coil Test Weekly Meeting 3-Dec-2009
From GlueXWiki
Solenoid Coil Test Weekly Meeting
Location and Time
- Thu 3-Dec-2009 9:45 am ARC 428
Agenda
- FastTrack schedule: status of merging two versions - George, Chuck
- some timelines appear to be out of date
- Latest coil test schedule - Tom
- Any news on using QWeak area? - Tom
- Status of getting bigger door in F117 - Tom
- Are modifications to the power supply dump resistor wiring needed? - Mark S
- Do we need a redundant PLC system - Elliott
- Status of interface to cryo can - George
- Status of pressure relief system design - George
- Status of ordering cryo can - George
- Ordering platform - George
- Construction/installation sequence drawings - George, Chuck
- Ordering remaining controls instrumentation and components - Scot, Elliott
- P&I, controls drawings, narrative - Tom, George, Scot, Mark S, Mark W
- Begin wiring effort in F117 - Scot
- PLC programming and testing - Mark W
- Coil 1 modification and testing - George
- Coil 2 cost and schedule - George
- Coil 3 statement of work, visit and IUCF contract - George, Tom
- Coil 4 controls wiring replacement - George
- Shipping rails and transportainer from IUCF - Tom
- Safety reviews: when to start formal process - George, Elliott
- 5 G contours - George
- Chris' group can do CAD rack layout if we wish - Elliott
- Coil Test Top To-Do items