Controls Meeting 06-Sep-2018

From GlueXWiki
Jump to: navigation, search
  • Announcements
  • Solenoid status (Tim,Beni,Brian)
    • Vacuum pump alarms
    • Liquid level : sensors vs formulae
    • ROOT GUIs on RHEL7
    • Time offset
  • ComCal
    • Translation stages (Tim, Hovanes, Vanik)
    • Voltages (Vanick, Nick)
      Interlocks for CAEN modules
    • LED pulser (Hovanes)
    • Temperature monitoring (Nick)
  • DIRC controls
    • Voltages (Nick, Hovanes)
      MPOD situation
    • LED Pulser (Hovanes)
    • Scalers and Temperatures (Hovanes)
  • Other

Time/Location

10:00AM Thursday 06-Sep-2018 CC B101