Dec 18, 2012 Calorimetry
From GlueXWiki
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Produce plots of SiPM parameters, such as the ones already shown, for Vover=1.0, 1.1 V (Orlando)
- After summary of SiPM parameters, provide data to Hamamatsu for comments (USM)
-
For the suspect SiPMs, calculate the integrated dark rate for the array to compare them (Orlando)Discussed at Bcal Readout meeting.
Tentative Agenda
- Announcements
- Review of Action Items
- FCAL
- BCAL
- USM
- Simulations
- TDR update
- Calibration of Calorimeters
- Any other business
Minutes
Attendees: Elton, David, John, Yi, Beni (JLab); Hayk, Will, Alam, Orlando (USM); Shawn, Zisis, Andrei (UofR); Matt, Kei, Dan (IU); Christina, George, Pavlos (Athens)
- Announcements
- Review of Action Items
- Monitoring
- Bcal boards are proceeding as scheduled. Controller boards are being stuffed.
- Fcal measurements with first-article has raised two issues
- Light uniformity on edges of plexiglass is improved by polishing edges.
- The 2 red LEDs seem to output sufficient light, but the 2 green LEDs do not produce sufficient light under nominal configuration.
- Amount of light collected from green LEDs with plexiglass is 1/2-1/3 of that with plexiglass
- Sanding the top and bottom increases collection of light by a factor of about 6. Still, Christina does not think this is sufficient.
- Elton: IU should propose the dynamic range of signals required for the LED monitoring system
- Christina: One may also try to find alternative LEDs that better match the dynamic range necessary
- FCAL
- Frame Installed
- Initialt survey and alignment of frame is ongoing now
- Techs still need to do more work to ready the frame. John Frye will come down after Jan 14 for fine alignment and help start stacking blocks.
- Stacking will start toward the end of January.
- Beamtest presentation
- DE: fit terms in quadrature in the parameterization.
- DE: consider fitting data sets with consistent HV configurations separately
- DT: evaluate Gaussian extraction of time to compare with previous studies
- Results on Energy and Timing Resolution of FCAL in 2011--2012 Beamtest analysis note
- Frame Installed
- BCAL
- USM
- Some discussion regarding consistent summary of data for all parameters at Vover =1.0, 1.1 V (to supplement data on 1.2V)
- Shipment of 360 sensors is still in Customs in Santiago, waiting for final disposition.
- Simulations
- TDR update
- Calibration of Calorimeters
- Any other business