FCAL Installation

From GlueXWiki
Jump to: navigation, search


Visual inspection of lead glass modules

Repairing of lead glass modules

Lead glass PMT and dividers


Rearranging FCAL cables

FCAL2 Crates

Distribution of signals and voltages

Testing and labeling cables

Removing FCAL cables from the detector


Work space in Hall D


Stacking FCAL2 modules

- Map of installed ECAL modules


Testing ECAL modules

Testing of PMT dividers

Installing dividers

Detector Alignment

List of tasks and manpower

Summer Students (2023)

- Students reports

Detector Photos

Usefull links

HyCal in Hall B

Status of the insert fabrication

Retrieved from "https://halldweb.jlab.org/wiki/index.php?title=FCAL_Installation&oldid=126060"

Navigation menu

Views

  • Page
  • Discussion
  • View source
  • History

Personal tools

  • Log in

Navigation

  • Main page
  • Recent changes
  • Random page
  • Help

 

Tools

  • What links here
  • Related changes
  • Special pages
  • Printable version
  • Permanent link
  • Page information
  • Cite this page
Powered by MediaWiki
  • This page was last modified on 2 June 2024, at 19:31.
  • This page has been accessed 8,173 times.
  • Privacy policy
  • About GlueXWiki
  • Disclaimers