February 5, 2021 DIRC
From GlueXWiki
Meeting Information
GlueX DIRC Meeting
Friday February 5, 2021
10:00 am, ET
Remote only
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Collaboration Meeting: Feb 17-19. DIRC update talk by Bill planned for Wed afternoon.
- TIPP Conference: abstracts due Feb 7 (Sunday)
- Mirror prototype test plan (All)
- Discussion of prototypes and ongoing tests (Bill, All)
- Half-size prototype: test began on Dec 22, inspections Jan 19 and Feb 1 show air gap is maintained over 6 weeks
- Full-size 3-segment mirror prototypes: test began on Jan 22 with weekly inspections: most recent Feb 1 looks great
- Top/bottom mirror prototype: plan to begin water test on Monday
- North mirror box un-installed and inspected: (All)
- Inspection of mirrors with dye test: one of 3-component mirrors remained air tight.
- Removing all mirrors and plan to re-anodize strongback at local shop
- Next steps in mirror process: (Justin)
- Final modifications to mirror sizes (Justin), then order borofloat (several weeks lead time for previous order)
- Production mirror assembly planned for clean hood and water tested in Hall D
- Other thoughts or suggestions?
- Discussion of prototypes and ongoing tests (Bill, All)
- Diffuser status (Bill)
- DIRC commissioning analyses and 2020 studies (All)
- Spring 2020 data production status: all 8 batches now in progress for REST reconstruction (Justin)
- Analysis launches completed for batches 3, 4, 5, 8
- Geometric reconstruction update
- Update on shift of the time difference (Roman)
- Cherenkov PDF (Ahmed)
- FastDIRC update (Yunjie)
- Spring 2020 data production status: all 8 batches now in progress for REST reconstruction (Justin)
- AOB