For the fourth coil

From GlueXWiki
Jump to: navigation, search

To-do list


  • Wiring
    • rewire for coil 2 subcoils
    • document trip chains
    • label circuit breakers


  • Danfysik power supply
    • commission new readout channels
    • commission fault sequencer
    • fix slow dump
    • understand ramp-down mechanism
    • choose ground fault detection mechanism


  • Danfysik quench detector
    • one or two channels?


  • Instrumentation
    • implement system to isolate fault detectors and determine time sequence of trips - postponed 8-Apr-2011
    • monitor circuit breakers?


  • VME-based fast DAQ
    • real-time graphics


  • A-B HMI improvements
    • implement fault sequence screens if system implemented
    • ensure auto elog entries work


  • A-B PLC program improvements
    • mods for new coil configuration


  • EPICS
    • new channels


  • EWEB screens
    • update for latest tags and drawings


  • Auxiliary tests
    • more crate tests


  • Reenable cron job
    • when cooldown commences, end when warmed up


For the hall

  • note that max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec
  • need travelers for coil installation.
  • should we install a UPS on the Danfysik contactor and control boards?
  • should we install a second contactor in the Danfysik power supply?
  • do we need additional valves, check valves, bypasses, whatever?
  • do we need Dataforth voltage attenuators on coil tap channels?
  • do we need active isolation of coil tap channels, etc?
  • should we monitor all circuit breakers?
  • should we monitor all relays?
  • what is the effect of B field on sensors/relays? should some instrumentation be relocated?
  • do we need new flow sensors, or should they be relocated?
  • lock box for power supply key
  • more ethernet power strips
  • use custom ("add-on") instructions to simplify PLC code
  • install permanent VME-based fast DAQ
  • logarithmic or equivalent current and voltage measurements
  • isolate coil taps
  • sequence of events module
  • attenuators on Dataforth modules
  • check dump resistor and diode in checklist, interlocks
  • backup in case dump resistor/diode broken
  • dump at low current to check dump system in checkout list
  • logarithmic amps on voltages to get full range
  • manual check of resistor/diode connection and polarity
  • improve checklists and test plan
  • resistor/diode checks in maintenance OSP and/or operations OSP