For the second coil
From GlueXWiki
To-do list
- Wiring
- remove jumper box and cables and bring to F117 for rework - done
- remove current-limiting resistor boxes, bring to F117 for rework - done
- minimize summed coil voltage readouts, do most sums in PLC - done
- add separate readouts of splice and vapor-cooled lead voltages - done
- combine splice and lead into one hardware quench/overvoltage protection channel using Newport controller - done
- match and balance all current-limiting resistors, go back to original 100k Ohm matched resistors - done
- read out voltage taps for quench detection and DAQ using separate resistor chain - done
- update wiring diagrams to "as built" - done
- get diagrams and spec sheets to Fernando - done
- checkout, understand noise, signal clipping and interaction between modules
- Danfysik power supply
- understand ramp-down mechanism - done
- measure fast dump resistors in power supply - done
- eliminate 2V DC offset - done
- fix slow dump - done
- make more copies of full Danfysik power supply manual (get from Steve L) - done
- implement ground fault detection compatible with quench detector
- Danfysik quench detector
- match and balance resistors - done
- install test points for gain/offset tuning - done
- install pots for balance - done
- install bias circuit to account for Danfysik DC offset and common mode voltage - done
- checkout
- Dataforth system
- Correct for 2M Ohm internal impedance and 200k Ohm resistors in voltage tap readouts - done
- Correct for other internal resistances (vapor-cooled leads and splice)
- USB device
- install voltage dividers to extend voltage range - done
- add resistors to Zener protection circuit - done
- complete Zener/divider box and checkout
- automated elog entries
- automatically dump screens to files - done
- create perl script - done
- create cron job - done
- A-B HMI improvements
- get additional HMI client license from Steve - done
- get second HMI computer working - done
- implement A-B license server - done
- get A-B IIS file server system working - done
- change HMI database to MySql - done
- create more pre-defined trend plots - done
- improve screen layouts - done
- upgrade to 100 screen license
- A-B PLC program improvements
- new channels - done
- improve, simplify program - done
- try A-B alarm and logging systems - done
- test PLC-based alarm system
- use custom ("add-on") instructions to simplify code
- EPICS
- get list of all tags from osh - done
- serve out all PLC channels to CA
- implement guard shack notification for IOC hang/crash
- EWEB screens
- update for latest tags and drawings
For the hall
- note that max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec
- should we install a UPS on the Danfysik contactor and control boards?
- do we need additional valves, check valves, bypasses, whatever?
- do we need Dataforth voltage attenuators on coil tap channels?
- do we need active isolation of coil tap channels, etc?
- should we monitor all circuit breakers?
Basic questions
- lag between field and current...are there turn-to-turn shorts in coil 1?
- maybe short, maybe eddy currents...
- will we open up coil 3 and/or coil 4?
- do we want an independent review of our fast (and slow) dump strategy and system?
- document our experience!