GlueX Start Counter Meeting, April 2, 2020
GlueX Start Counter Meeting
Thursday, April 2, 2020
10:00 am EDT
BlueJeans: 556 286 544
Contents
Agenda
- Announcements
- Review minutes from the last meeting
- Calibration and Efficiency (Rupesh)
- Dark Rate Studies (Beni, Rupesh, Tolga)
- Action Item Review
Minutes
Present: Rupesh Dotel, Tolga Erbora, Mark Ito, Simon Taylor, Beni Zihlmann
There is a recording of this meeting on the BlueJeans site. Use your JLab credentials to gain access.
Review minutes from the last meeting
We went over the minutes from March 5 without significant comment.
Calibration and Efficiency
Rupesh showed counter-by-counter time resolution for the start counter after the propagation-time calibration. See his slides for the plots. At Sean's suggestion he tried applying constants obtained from run 71724 to data from run 71724 itself to see if there was a significant improvement over resolution using constants obtained from run 71003. Only slight improvement was visible.
The constants from run 71724 have been entered into the default CCDB variation for all of the Fall-2019/Spring-2020 run. Rupesh is looking at calibrating a few more runs dispersed throughout the run and applying them appropriately to smaller time periods of the run.
Dark Rate Studies
Beni showed the results from dark rate runs. See the plot below. The y-axis is the ratio of the area of a Gaussian fitted to the pedestal distribution, but using only the low side of the distribution, to the area of the entire pedestal distribution, as he described in a GlueX Doc from last year. The x-axis is accumulated coincidences from the pair spectrometer as a proxy for beam photon flux. Significant increase in dark current is seen.
Tolga has started reviewing Beni's code and will try to reproduce these results.
Action Item Review
- Obtained calibrations for sub-periods of the recent run. (Rupesh)
- Reproduce Beni's dark current results. (Tolga)