From my notes, we would like to accomplish the following in September;

1. Finalize P&I diagram
2. Finalize Cryo design including location of cold head and compressor and pipe/valve sizing
3. Issue procurement for the refrigerator
4. finalize list of all valves and gages (Chris)
5. Set up a mini design review to include Chris, Dave Meekins, Elliot Wolin (controls), Mark Ito, Rory (UMass)

The following requirements apply;

All components to be ASME code equipment
All must be hydrogen safe (explosion proof)
500 gauss field maximum for cold head
Controls must ensure the turbo pump shuts down if there is a hydrogen leak.

The target group will do all the welding of the components inside the Hall and fabricate the gas panel.