GlueX Target Meeting, April 17, 2009
From GlueXWiki
2009 April 17, 10:00-11:00 F326
The agenda is not strict and should accommodate discussions
- General requirements for the GlueX target 10 min
- LH2 target 30 cm long, 2 cm diameter (for 3.4 mm collimator)
- Beam power in LH2 < 100 uW (high luminocity)
- Hall B target adapted to Hall D: Hall D hydrogen target
- Continuous vacuum from Pair Spectrometer to the target? (requirements: pressure, interlocks etc)
- Solid targets (discussion)
- Cryo supply (George) 5 min
- General requirements to the PRIMEX target (Rory) 5 min
- Target group view (Chris) 10 min
- Providing specs - discussion