JEF meeting, December 4, 2020

From GlueXWiki
Jump to: navigation, search

Meeting time and location= 9:00 am EST (JLab time) Bluejeans only


Connection instructions

We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.

  • Make sure you have created a BlueJeans account via your JLab CUE account using this link:
  • If connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
  • If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above

Agenda

Minutes

Attendees: Igal, Sasha, Jared, Bill B., Jane, Phil, Liping, Tim B., Tim W., S.T.

  • Initial QA of 2nd batch of SICCAS crystals complete
    • Sasha cleared procurement
    • Week of 12/7: transmission measurements of 10-20 crystals; will compare measurements with SICCAS/Jane's results
  • 3rd batch under construction, shipping schedule not clear
    • Need to order 500 more -- not this fiscal year?
  • Consensus was to give up on NSF MRI grant for crystal insert -- maybe smaller grants for insert work?
    • Liping: supplemental funds for summer'21 work?
    • Phil offered to help out with summer'21 work as well
  • Construction of a small number of new modules more or less ready to go (Sasha wants to do a few by hand to firm up procedure before Christmas)
  • PMT active base design almost complete (?)
    • Vlad P. modified design to increase voltage on first dynodes + reduce voltage on last dynode -> reduced gain
    • Also modified to reduce anode current (needs to be < 1 mA)
    • Sasha compared amplitudes and anode currents for various configurations (with/without 3x external amplifier, old/new design)
    • Shape of signal from LED pulse differs between base with bypassed amplifier and one with 3x amp
      • Measure integral/peak to assess
    • PCB board design complete (modulo resistor values)
      • Order to be placed in January, 3 weeks delivery time estimate
    • Plan is to implement new bases in COMCAL, use as prototype for insert
  • Jared is preparing a report on his signal PDF studies for the dark scalar search
  • Simulation/reconstruction
    • S.T. slow progress working on implementing island algorithm for FCAL-II
    • Discussion regarding adding detectors in front of FCAL/CCAL to use as charged particle vetoes
    • Discussion of using CCAL clusters in GlueX reconstruction/simulation
      • Geometry needs to be updated (beam pipe)
      • Some data with CCAL was taken during the most recent run -- caused issues with particle combinations for event reconstruction: resolved?