JEF meeting, March 28, 2025
From GlueXWiki
Connection
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
Installation of the FCAL2 detector & integration to GlueX -- Sasha, All
Preparing for the run -- Sasha
- Reconfiguring MPODs for LV power supply [1]
- Check mapping of ECAL modules [2]
- Final check of the detector
Restoring PS test setup [3]
Calibrations
Minutes
Attendees: Bill, Sasha, Drew, Vlad, Igal, Hakob, Zisis, Axel, Liping, Jane, S.T.
- Reconfigured MPOD for low voltage to measure voltage at end of cable
- Voltage drop ~0.5 V
- for consistency in setting voltages for dividers
- ECAL final check with LMS looking at waveforms
- Found 2 swapped channels, now fixed
- Everything okay except for one missing channel due to fiber, cosmics look okay
- Work on building small prototype for test on positron PS arm in hall proceeding
- 5x5 array lead tungstate + 5x5 array lead glass for measuring shower profile and studying transition region
- Lead glass currently in ESB
- Borrowed conventional bases
- Will use COMCAL box
- Assembly is heavy, need to identify table that can accommodate weight, identified one currently used by EIC folks
- VXS crate installed
- Need 2 more FADCs
- 5x5 array lead tungstate + 5x5 array lead glass for measuring shower profile and studying transition region
- Still considering building a small veto counter to cover region not covered by TOF