January 26, 2015
From GlueXWiki
- Trigger setup in the counting house (Sergei)
- - two crates have been moved from F117. Take one crate from the trigger rack in the hall.
- - find replacement for the crate in the hall (realocate DSC to another crate)
- Firmware update
- - TI, FADC250 (BCAL, PS/PSC, ST, TAGM/TAGH)
- - Change jumpers/switches on SD boards for bcal crates (Sergei P.)
- - connect TI trigger front panel output to F1 TDCs
- - Check trigger performance with play back - in progress
- Trigger algorithm study for the spring run
- FCAL trigger tuning
- decreasing integration window size (time).
- - propagation time for MIPs (MC simulation)
- - cable length, PMT transit time spread
- - check with acquired data
- decreasing integration window size (time).
- FCAL thresholds tuning
- - check rates with MC simulation (MC)
- - MIP response
- Coincidence of FCAL with other sub-detectors
- - require tracks in ST
- - energy correlation with BCAL
- - combined trigger base on BCAL/ST correlations and FCAL thresholds
- Level-1 Monitor