List of ECAL cosmic runs

From GlueXWiki
Jump to: navigation, search

Location of files:

on gluons:

/gluonraid5/data4/rawdata/volatile/RunPeriod-2025-01/rawdata/Run130056


the files should be copied to

/cache/halld/RunPeriod-2025-01/rawdata


ECAL North

Scint paddles, north, HV set to 1350 V

1 trigger per 5.6 sec

one good track per about 6 events


Run Number Date (time) Events Comments
130056 Nov-7, 12:21 1500 HVs set to 1040 V for all channels, readout threshold 6 ADC counts, north trig paddles, rate 0.2 Hz, chiller set 64.4 F
130057 Nov-7, 14:52 2009 the same
130060 Nov-9, 14:32 150 the same, the chiller set to 60 F, test conditions, data Ok
130061 Nov-9, 14:46 2801 the same
130063 Nov-10, 16:04 4003 the same
130064 Nov-11,12:22 3231 the same, the chiller set to 55 deg F.
130065 Nov-11,17:11 1008 the same, the chiller set to 55 deg F.
130066 Nov-12,12:22 1904 the same, the chiller set to 55 deg F.
130068 Nov-13,11:58 1586 the same, the chiller set to 55 deg F, add extra fan blowing to the right column.
130069 Nov-13,19:50 2470 the same, the chiller set to 55 deg F, add extra fan blowing to the right column.
Total 20662
130074 Nov-22, 17:30 221 the same
130075 Nov-22, 17:50 3158 the same
130077 Nov-22, 17:50 1530 add one more fan
Total 25571
130090 Dec-1, 17:55 3050 Adjust voltages, set max HV to 1040 V, set amplitudes to 9 ADC counts, ADC threshold 5 counts
130091 Dec-2, 18:43 3272 the same
130092 Dec-3, 9:58 4214 the same



ECAL all HVs switched ON

Setup: ECAL_cosmic.conf (fadc in raw mode)


Run Number Date (time) Events Comments
130145 Dec-22, 12:41 2500 events HVs set to 1040 V for all channels, readout threshold 6 ADC counts
130147 Dec-22, 19:22 300 events HVs set to 1040 V for all channels, readout threshold 6 ADC counts, adjust trigger settings
130158 Dec-22, 20:34 - Dec-25, 12:00 74772 events HVs set to 1040 V for all channels, readout threshold 6 ADC counts
130159 Jan-2,2025 18:44 23484 events HVs set to 1040 V for all channels, readout threshold 6 ADC counts
130160 Jan-3,2025 14:52 27058 events HVs set to 1040 V for all channels, readout threshold 6 ADC counts
130161 Jan-4,2025 13:14 12451 events HVs set to 1040 V for all channels, readout threshold 6 ADC counts, switch off voltages in the inner most layer
130162 Jan-5,2025 16:45 79446 events HVs set to 1040 V for all channels, readout threshold 6 ADC counts, switch off voltages for 2 inner most layers


Fix all channels, reduce HV's, peak at 9 adc counts

Fixed most channels: (-11,-17) bad cable, (-11,17) unstable amplitude (replace divider), (18,17) and related (replace flash adc, rocecal1, slot18), (-16,2) and (-16, 4) replaced dividers and reconnect PMT, (-14,2) secure divider connection

Run Number Date (time) Events Comments
130222 Jan-15, 20:06 17325 events readout threshold 6 ADC counts
130241 Jan-17, 10:52 1258 events readout threshold 5 ADC counts
130270 Jan-18, 0:44 48047 events readout threshold 5 ADC counts (DAQ crashed, events lost)
130271 Jan-19, 17:08 3288 events readout threshold 5 ADC counts
130273 Jan-19, 20:18 15011 events readout threshold 5 ADC counts
130295 1730 events readout threshold 5 ADC counts
130296 Jan-21, 19:28 19630 events readout threshold 5 ADC counts
130297 Jan-22, 12:09 7212 events readout threshold 5 ADC counts (HV on a few modules tripped)
130298 Jan-22, 18:28 19871 events readout threshold 5 ADC counts (HV on a few modules tripped)
130299 Jan-23, 11:29 3202 events readout threshold 5 ADC counts, set trip current set point to 1 sec, new hv file
130307 Jan-24, 22:31 51132 events readout threshold 5 ADC counts, set trip current set point to 1 sec, new hv file. HV module in slot 8 of the D2-4-TOP crate failed
130308 Jan-25, 19:46 17373 events readout threshold 5 ADC counts, set trip current set point to 1 sec, new hv file. Replace HV module in slot 8


Adjust HV (the third iteration)


Run Number Date (time) Events Comments
130309 Jan-27, 19:00 14371 events readout threshold 4 ADC counts, recalibrated baselines on roecal1,2,3

Long maintenance time, resume data taking with the same settings, re-calibrate baselines, two new fans installed

Run Number Date (time) Events Comments
130337 Jan-31, 17:46 24017 events readout threshold 4 ADC counts
130338 Feb-1, 14:00 6073 events readout threshold 4 ADC counts
130339 Feb-1, 19:15 19985 events readout threshold 4 ADC counts
130340 Feb-2, 13:06 7586 events readout threshold 4 ADC counts
130341 Feb-2, 19:52 14731 events readout threshold 4 ADC counts
130342 Feb-3, 9:03 3918 events readout threshold 4 ADC counts
Access to the dark room
130345 Feb-3, 21:18 10000 events readout threshold 4 ADC counts, HV interlock around 5:30 am, many triggers without ECAL HV
130350 Feb-6, 13:00 19000 events readout threshold 4 ADC counts
130351 Feb-6, 22:47 events, coda killed readout threshold 4 ADC counts
130352 Feb-8, 14:49 23885 events readout threshold 4 ADC counts
130353 Feb-10, 9:22 26385 events readout threshold 4 ADC counts