May 9, 2013 SiPM Electrical and Cooling
From GlueXWiki
Action Items from previous meetings
- Mount one of the completed assemblies onto a module in the ESB to evaluate any possible interferences with cables. (Chris and Nic)
- Order second "half" top plate and modify tool for single replacement (Jim)
Tentative Agenda
- Announcements
- Action Items
- Light guides (Tina)
- Light guide testing (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Electronic boards and SiPM sorting (Fernando and Chris)
Minutes
Attending: