Photon Beam Commissioning Discussion Sept 24, 2014

From GlueXWiki
Jump to: navigation, search

Organization

  • Time: 4:00 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Eugene, Alexandre for Hall D)
    • Need rates for profiler, start counter, ps
  • Complete the tagger drawing with the expected configuration for the fall running, including all shielding. (Tim, Chuck, Elton)
  • Screen of beam parameters for Hall D (Hovanes)
  • Feedback on accelerator on latest ICD draft (Michael, Todd)

Agenda

  1. Announcements
  2. Accelerator and Hall D Interface Document - update
  3. Update on Photon Commissioning (Alexandre)
  4. Beam Simulations
  5. RadCon update
  6. Other business

Minutes

Attending: Elton, Alexandre, Hovanes, Tim, Eugene, Nathan (Hall D); Michael (Ops); Curtis (CMU); Richard (UConn)

  1. Announcements
    • New accelerator schedule with likely close up of Hall D on Oct 10.
    • No meeting next week, just collaboration meeting.
  2. Action items
    • Note see below for update from Richard on simulations
    • Drawing. Tim says there will be an update by the end of the week
  3. Accelerator and Hall D Interface Document - update
  4. Update on Photon Commissioning (Alexandre)
    • Alexandre has added a diagram with the schedule.
    • Comments and feedback were made to the new diagram
    • The trigger commissioning plan from Sasha needs to be folded in with this schedule.
  5. Beam Simulations (Richard)
    • Submitted a job to simulate 1billion events to the OSG
    • No diamond radiator, replaced with 10 microns of Carbon
    • Boosted halo fraction to 1% (instead of 10^-5)
    • Made a box on the floor underneath the microscope to determine fluxes at the SiPMs
    • Added a matt 5x5m2 on the floor to determine fluxes
    • So far about 2/3 complete
    • Richard will report on this at the collaboration meeting
    • Richard also offered time on the OSG if Pavel would like to submit jobs using a build executable. Pavel may do this when it is ready
  6. RadCon update (Pavel)
    • Setup of archiving of averages in progress
    • Need a list of EPICS variables from Alexandre and Hovanes.
    • Additional shielding is needed around be beam pipe inside the labyrinth. This may not be necessary for this run, but will avoid work in that area after a beam period. Tim said that Pavel can close the loop with Keith and Neil can probably complete the needed work.