Run Coordinator report: Spring 2018 r6

From GlueXWiki
Jump to: navigation, search

Here is a brief summary of the progress over the last week (Feb. 14 - Feb. 21) while I was run coordinator. Out of the 168 possible hours, CW beam was delivered to Hall D for 68 (41%) of which we used X hours (Y%). Over the last week, we've collected about 6 billion triggers putting the total for the spring 2018 run to about 52 billion.

Accelerator spent time on improving the beam quality for all halls. They are now delivering ~60 uA to hall C and ~20 uA to hall A (total of 80 uA) which was their goal. Our beam tune was improved and is now hovering around our specs. During the accelerator downtime, we made multiple controlled accesses using the rapid access system. These accesses involved FCAL bases, the muon chamber, the TAGM electronics, and the active collimator electronics.

In addition to production data, we collected data for the high intensity DAQ test with the DAQ group, the high intensity trigger study for Sasha, and the current scan to understand how features of the data scale with increasing intensity.