Run Planning Meeting Notes, Jan 23-Jan 29, 2020

From GlueXWiki
Jump to: navigation, search

Trigger Spreadsheet

Trigger Counter

Wednesday, January 29 at 08:45

  1. Last 24 hours
    • Beam chopper amplifier replacement, recovery at 11pm
    • Solenoid recovery [1], [2], reached nominal current shortly after midnight
    • New microscope discriminator thresholds [3], [4], [5]
  2. Issues
    • DIRC was off [6]
  3. Reports
    • Noisy tagger hits solved [7]
  4. Plans for today
    • Harp scan
    • Production
    • Diamond alignment?
    • Hall B is down for 3 days for installation starting Thursday morning, possibility for TAC run with our own slit?

Tuesday, January 28 at 08:45

  1. Last 24 hours
    • First day of production with 350nA beam current!
    • PS timing window reduced [8]
    • 11:30 Solenoid trip [9], [10], [11], recovered after reset of cryo compressor
    • 03:50 Solenoid trip [12], [13], instability on power supply, investigation ongoing
    • Issues with chopper → almost no beam loss
  2. Issues
    • TOF point disappearance after window shift [14], [15]
    • Missing DIRC blocks [16]
    • Event size increase due to CCal [17]
  3. Reports
    • Rates [18] (Alexandre)
    • Trigger rates and dead time at 350nA [19] (Sasha)
    • PS multiplicity and timing [20] (Sasha)
  4. Plans for today
    • Work on RF instability (~hours) [21]
    • Start diamond alignment afterwards

Monday, January 27 at 08:45

  1. Last 72 hours
    • Mostly Production with 250nA beam current
    • Empty target runs with 250nA (71533) and 350nA (71532) on Friday
    • Harp Scan on Sunday [22]
    • CCal Anode Tests on Sunday evening (Sasha) [23]
  2. Issues
  3. Reports
  4. Tasks for the today
    • Increase beam current to 350nA
      • Switch off low-energy TagH counters (new EPICS configuration file) [31]
    • No beam study / RF recovery planned
    • Diamond alignment later this week

Friday, January 24 at 08:45

  1. Last 24 hours
    • Production with 250nA beam current
    • Beam current and position [32], [33]
  2. Issues
    • Frozen total PS/FCal rates fixed (Hovanes)
    • Goniometer image missing [34]
  3. Reports:
  4. Tasks for the today and the weekend:
    • Empty target run after the meeting if beam is taken away
    • PS Timing Studies (Friday)?
    • Production
    • CCAL anode study (Saturday)?
  5. Monday:
    • Increase beam current to 350nA

Thursday, January 23 at 08:45

  1. Last 24 hours
    • Various accelerator problems: Arc PS, Injector, Cavity HV [36]
    • Check-out of PS, TagM, TagH, ST after timing window shift [37], [38]
    • Harp Scan [39]
    • Continue production with 250nA beam current
  2. Issues
  3. Reports:
  4. Tasks for today
    • Production
    • DOE tour in Hall B/C (8:00 - 12:00?)
    • Spin dance (12:00?)
  5. Plan for later
    • CCAL anode study?
    • Alternative diamond alignment
    • ST trigger?