- Single-person shift schedule in operation, since Tuesday 16:00
- the schedule, linked from main Hall-D web page -- Eugene
- the shift rules, linked from main Hall-D web page -- Eugene
- the shift rules, linked from hdops wiki -- Eugene
- 4-hall video feeds are now available, displayed on screen above copier
- Continuous bluejeans meeting open in counting house -- Needs another connection in order to remain open.
Contents
Thursday, March 19
- Last 24 hours
- Shift Summaries Afternoon Swing Owl Early Riser
- TAC run -- MCC report
- Reports/Issues
- Transmission is back to higher level -- Alexandre
- BCAL LED triggers missing -- Elton
- Run Plan
- Production
Friday, March 20
- Last 24 hours
- Completed 0/90 PARA, 0/90 PERP, 45/135 PARA, 45/135 PERP, AMO 4.5x10-4, begin 0/90 PARA
- Shift Summaries Afternoon Swing Owl Early Riser
- Monitoring Okay [1], [2]
- CDC 2 channel trip on over-current -- Elton
- Later ramp up fine. -- Elton
- BCAL Hot channel fixed by Sergey
- Reports/Issues
- Run Plan
- Production
Saturday, March 21
- Last 24 hours
- Completed a full cycle of radiator settings
- Shift Summaries Afternoon Swing Owl Early Riser
- Monitoring:
- Various issues CDC and FDC holes, -- Olga
- RF & TPOL - quite different to reference plots. -- Ken
- Reports/Issues
- DAQ problems -- Amy
- 8% PS rate decrease over 2-3 hours -- Elton
- FDC HV trip --
- Empty target results -- Simon
- fadc250 "bad pulse data" bug in earlier 2020 spring data diagnosed, solved -- Richard
- Run Plan
- Need to plan for MEDCON6 and an orderly shutdown (while maintaining a 6 foot distance or using PPE.)
- Production
Sunday, March 22
- MEDCON6 Shutdown Plan
- Last 24 hours
- Shift Summaries Afternoon Swing Owl Early Riser
- Monitoring:
- Production run with CCAL
- Reports/Issues
- Run Plan
- Production
Monday, March 23
- MEDCON6 Shutdown Plan
- Bring lab to minimum safe ops state.
- Complete by the end of the week (end of site access)
- Expect email from management
- Last 24 hours
- Shift Summaries Afternoon Swing Owl Early Riser
- Monitoring: [5] [6]
- CCAL put into production
- Reports/Issues
- Transmission drift
- DIRC Tile temperature alarm (restart DAC)
- Chromium browser installed to fix window issue
- Run Plan
- Last day of running
- short TOF trigger test run for CPP experiment: DIRC out, B-field ON at 1350 A (nominal), Detector in nominal position. (I assume this test would be useful even if the Forward carriage was somewhat downstream?)
- Empty target data
Tuesday, March 24
- Last 24 hours
- Cavity failure 2l24
- Raw mode run while emptying target
- Empty target running (doubling the existing statistics)
- Baseline study (no-beam run to study SiPMs)
- CCAL integrated in trigger and retracted
- Shift Summaries Afternoon Swing Owl Early Riser
- Monitoring: [7] [8]
- Reports/Issues
- Run Plan
- Down Hard
- MEDCON6 Shutdown Plan