Action Items to be addressed

  1. We need to specify the way of winding the coils for the tagger magnet. If the coils are wound badly you can have an unwanted heat exchange between the incomming cold water<br\> and the heated exhaust water. Juergen Ahrens described a good winding pattern in the mail below.<br\> Coil winding proceedure from Juergen Ahrens
  2. Juergen recommended using high tension rods going all the way through the magnet to bolt it together. This will save holes and will reduce machining so we should definately do it.
  3. Juergen suggested that when we lift the middle magnet yoke plate off the vacuum chamber we may have difficulties. He recommended foreseeing some jacks to help at the start when lifting.
  4. It needs to be verified that Moeller events are generated in the simulation.
  5. If the beam is mis-steered which system will trip first?
  6. It was suggested to consider making the pair spectrometer vacuum chamber top and bottom plates from iron. This may be cheaper than bolting plates onto the pole and will reduce the pole gap.
  7. The design of the downstream end of the vacuum chamber should be completed.
  8. Update the official GEANT geometry to reflect the present status.
  9. Finish first pair spectrometer iteration: rotate WSF counters, check thinner iron shielding, and estimate dose in the coils.
  10. Look at not using a rawgowsky countour on the +x face. This may make installation easier.

Final talks

Preliminary Material Prepared for the Review

  • Pre-brief Material for the reviewers
  1. General Documents
  2. Tagging Spectrometer
  3. Electron Machine
  4. Fixed Hodoscope
  5. The microscope detector
  6. Pair Spectrometer
  7. Simulations of collimatior cave and pair spectrometer background- Alex
  8. Trigger rates and background - Alex

Relevant Wiki Pages

Dry Run Schedule for the Review

Connection Instructions:

  1. ESNET: join DOE ECS videoconferencing room 8542553.
  2. EVO: in community Gluex, look for "Photon Beam Review Dry Runs" meeting.
  3. Telephone: connect using the evo telephone bridge (for numbers, click here), with meeting Id's listed in parentheses below, and pass code 6626.

First round of dry runs (week of November 3rd)

Thursday, November 6, 2008 Room Elke's office and B101 after lunch (evo meeting id 614236)

Toll free: +1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International
participant code: 39527048#

Friday, November 7, 2008 Room F326/327 (evo meeting id 614247)

Monday, November 10, 2008 Room F326/327 (evo meeting id 614258)

Richard not available 12:00 - 14:00

Second round of dry runs (week of November 10)

Tuesday, November 11, 2008 Room F326/327 (evo meeting id 614269)

Wednesday, November 12, 2008 Room F326/327 (evo meeting id 614270)

Thursday, November 13, 2008 Room F326/327 (evo meeting id 614281)

Friday, November 14, 2008 Room F326/327 (evo meeting id 614292)

Main Review

  1. Review: November 19 and 20.
  2. issues that need special attention